Winter Special Sale Limited Time 60% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 713PS592

5V0-41.20 VMware SD-WAN Troubleshoot Questions and Answers

Questions 4

Scenario 2:

After completing the branch activation activities for all required branches, the administrator attempts to test connectivity between the various branches and between the hubs and branches- The administrator notices a lack of connectivity despite being certain that configurations have been complete. The administrator also observed that several users are reporting intermittent connectivity to some of the applications they are accessing. Other users are reporting no access to these applications. Other users at some of the branches claim they cannot get to certain public resources. The administrator wants to ensure that all sites can talk to each other and all resources are accessible.

Exhibit.

5V0-41.20 Question 4

The tunnel from the Dallas site to the Seattle hub is not coming up.

What are two things that should be checked to determine the issue? (Choose two.)

Options:

A.

Hub WAN Interface might be behind a firewall.

B.

Spoke Edge and Hub Edge have a mismatched certificate.

C.

Dynamic Branch to Branch is not enabled.

D.

Spoke Edge and Hub Edge are two different Edge models.

Buy Now
Questions 5

Scenario 1:

A network administrator is tasked with enabling SD-WAN at three branch locations. A topology has been provided for reference. For each site, the administrator is having issues bringing edges online, as another administrator has gone ahead and created a configuration ahead of lime. The organization has several branch sites. One is an Internet-only site and two are Hybrid locations with both internet and MPLS. The last location is MPLS only. There are hub data center locations in this environment as well. Please refer to the topology.

Exhibit.

5V0-41.20 Question 5

When attempting to activate an Edge, after clicking on the "activation link" in the email that was sent to the network administrator, the Edge's local UI shows as "Internet down". This is preventing the Edge from coming online and being activated. When referring to the output, the network administrator notices that the Edge has received DHCP addressing.

What could be preventing the Edge from coming online?

Options:

A.

The next hop does not respond to ICMP pings.

B.

Cloud VPN is not enabled in the AMER Branch profile.

C.

The subnet mask assigned to the Edge is incorrect.

D.

The Edge's profile does not specify the correct Edge Model.

Buy Now
Questions 6

Scenario 2:

After completing the branch activation activities for all required branches, the network administrator attempts to test connectivity between the various branches and between the hubs and branches. The administrator notices a lack of connectivity despite being certain that configurations have been complete. The administrator also observed that several users are reporting intermittent connectivity to some of the applications they are accessing. Other users are reporting no access to these applications. Other users at some of the branches claim they cannot get to certain public resources. The administrator wants to ensure that all sites can talk to each other and all resources are accessible.

Exhibit.

5V0-41.20 Question 6

Where can the network administrator check to see what routes are present on the London-site Edge?

Options:

A.

Log into the VCO > Configuration > Overlay Flow Control

B.

Log into the VCO > Test & Troubleshoot > Remote Diagnostics > Run "List Paths"

C.

Log into the VCO > Test & Troubleshoot > Remote Diagnostics > Run "Route Table Dump"

D.

Log into the VCO > Monitoring > Overlay Flow Control

Buy Now
Questions 7

Scenario 3:

After resolving numerous connectivity issues throughout the various branch sites, connectivity between applications and users is finally present. The network administrator is informed that during certain tests, applications are not performing as they are expected to. Users report that call quality has not fully improved and that some of their calls either drop or have poor voice quality where the conversation is breaking up. Other users are noticing that file transfers are slower than expect. A group of users from a few sites have reported slowness in accessing internal and external applications.

Exhibit.

5V0-41.20 Question 7

A network engineer is configuring an Internet Backhaul Policy for the Chicago Branch to utilize NY's hub as a much better source for Internet for certain SaaS applications. For an unknown reason, the network engineer is not able to select the hubs in the Internet Backhaul Policy.

What could be the reason?

Options:

A.

The Dynamic Branch to Branch has not been enabled.

B.

The hub is not configured with the proper IP address.

C.

Dynamic Branch to Branch using gateways has not been enabled.

D.

The Edge's profile does not include Backhaul hubs as an option.

Buy Now
Questions 8

Scenario:1

A network administrator is tasked with enabling SD-WAN at three branch locations, A topology has been provided for reference. For each site, the administrator is having issues bringing edges online, as another administrator has gone ahead and created a configuration ahead of time. The organization has several branch sites. One is an Internet-only site and two are Hybrid locations with both internet and MPLS. The last location is MPLS only. There are hub data center in this environment as well. Please refer to the topology.

Exhibit.

5V0-41.20 Question 8

One of the Edges at the Chicago site is unable to activate. The Edge has a red LED. What is the next troubleshooting step?

Options:

A.

If the Edge is connected to its HA peer, determine if there is a link-light on the HA peer-link.

B.

If the Edge is connected to the MPLS circuit, determine if the Hub is advertising gateway routes.

C.

If the Edge is connected to the MPLS circuit which does not have DHCP, determine if there is a static IP configuration that needs to be applied upon activation.

D.

If the Edge is connected to its HA peer, determine if underlay BGP peering is present between the two Edges.

Buy Now
Questions 9

Scenario 3:

After resolving numerous connectivity issues throughout the various branch sites, connectivity between applications and users is finally present. The network administrator is informed that during certain tests, applications are not performing as they are expected lo. Users report that call quality has not fully improved and that some of their calls either drop or have poor voice quality where the conversation is breaking up. Other users are noticing that file transfers are slower than expect. A group of users from a few sites have reported slowness in accessing internal and external applications.

Exhibit.

5V0-41.20 Question 9

Users are complaining that web pages to certain web sites are very slow to load and at times unresponsive. The network administrator has verified that the traffic is going correctly out the underlay.

What should the administrator check next?

Options:

A.

Verify if Path-MTU Discovery is disabled.

B.

Verify if there is latency, loss, or jitter on the underlay.

C.

Verify the Business Policy flows are matching.

D.

Verify if routes to Gateways are present in the Overlay Flow Control (OFC).

Buy Now
Questions 10

Scenario 3:

After completing the branch activation activities for all required branches, the network administrator attempts to test connectivity between the various branches and between the hubs and branches. The administrator notices a lack of connectivity despite being certain that configurations have been complete. The administrator also observed that several users are reporting intermittent connectivity to some of the applications they are accessing. Other users are reporting no access to these applications. Other users at some of the branches claim they cannot get to certain public resources. The administrator wants to ensure that all sites can talk to each other and all resources are accessible.

Exhibit.

5V0-41.20 Question 10

The network administrator determines that dynamic routes to SD-WAN sites are missing at the San Jose branch router. The network administrator decides to look into the configurations of hub Edges. All SD-WAN branch sites must use a hub to communicate with the San Jose site. Best practices have been implemented at these SD-WAN sites.

Where should the administrator check first to verify if the configuration is correct?

Options:

A.

Verify that the NVS feature is enabled in Cloud VPN.

B.

Verify that redistribution between the primary hub site and San Jose is enabled.

C.

Verify the static routes to San Jose from all Branches are configured.

D.

Verify that redistribution at the Dallas Hybrid Site is enabled for San Jose to use as a peering point.

Buy Now
Exam Code: 5V0-41.20
Exam Name: VMware SD-WAN Troubleshoot
Last Update: Nov 30, 2024
Questions: 36

PDF + Testing Engine

$66  $164.99

Testing Engine

$50  $124.99
buy now 5V0-41.20 testing engine

PDF (Q&A)

$42  $104.99
buy now 5V0-41.20 pdf