Questions 4

You are the business analyst for your organization. Management has asked you to create a plan that will define the proposed structure and schedule for communicating the business analysis activities to the appropriate stakeholders. What plan does management want you to create?

Options:

A.

Stakeholder Management Plan

B.

Business Analysis Plan

C.

Communications management plan

D.

Business Analysis Communications Plan

Buy Now
Questions 5

Shelly is the business analyst for her organization and she's working with Thomas to review the business requirements. They are discussing the identified requirements, how the requirements will transition to the operations, and the longevity of the solution. Thomas is concerned that theidentified requirements may not map to the desired future state of the organization. What business analysis task is Shelly facilitating in this scenario?

Options:

A.

Acceptance evaluation criteria definition

B.

Requirements quality assurance

C.

Validate requirements

D.

Stakeholder management

Buy Now
Questions 6

Sam is preparing for the task of prioritizing requirements and he'll need five inputs to accomplish the task. Which one of the following is not an input that Sam will use to prioritize requirements?

Options:

A.

Risk analysis

B.

Business need

C.

Requirements management plan

D.

Business case

Buy Now
Questions 7

There are five tasks and six inputs to requirements management and communication. As a business analyst, you'll need to gather all of the following inputs for this knowledge area except for which one?

Options:

A.

Requirement Management Plan

B.

Work breakdown structure

C.

Business Analysis (BA) communication plan

D.

Solution scope

Buy Now
Questions 8

Which element of the process of assessing the capability gaps is best described as gathering as much enterprise architecture information as is available about the current state of the organization and the areas affected by the business need?

Options:

A.

Current capability analysis

B.

Current organizational needs assessment

C.

Enterprise architecture assessment

D.

Snapshot baseline

Buy Now
Questions 9

You are the business analyst for a large software development project. There are several issues that must be resolved by certain dates or the problem will prevent the project from advancing. What technique can you use to track problems with the requirements?

Options:

A.

Issue tracking

B.

RTM

C.

Problem tracking

D.

Baselining

Buy Now
Questions 10

What element of the plan business analysis process affects the business analysis duties that need to be performed?

Options:

A.

The experience of the project manager

B.

The expected completion date of the business analysis duties

C.

The type of project or initiative

D.

The experience of the business analyst

Buy Now
Questions 11

You have 83 project stakeholders from all across your organization. Some of the stakeholders, such as functional management, require weekly communication from you, while other stakeholders, such as the end users, only need quarterly progress updates. Where can you record these communication requirements based on your stakeholder analysis?

Options:

A.

Project schedule

B.

Project scope management plan

C.

Project reporting structure

D.

Project communications management plan

Buy Now
Questions 12

All of the following are examples of elicitation techniques that are used as part of the business analyst elicitation task except for which one?

Options:

A.

Brainstorming

B.

Observation

C.

Decomposition

D.

Prototyping

Buy Now
Questions 13

You are the business analyst for your organization and you're creating the requirements package. In this documentation, to what level should you document the requirements for your stakeholders?

Options:

A.

All requirements should be clearly defined with technical, business, functional, and non-functional attributes.

B.

All requirements should be defined only to the extent needed to assure understanding by the team.

C.

All requirements should be defined to the extent the organizational process assets demand.

D.

All requirements should be defined in detail to the work package level of WBS.

Buy Now
Questions 14

Beth is the business analyst for her organization and she's creating a data dictionary for her organization. All of the following information should be included in the data dictionary for an endeavor Beth is leading except for which one?

Options:

A.

Description

B.

Aliases

C.

Name

D.

Code of account identifier

Buy Now
Questions 15

When a business analyst performs requirements tracing, he may need to trace the requirements backward through their lineage and may need to trace the requirements forward through their relationship to other requirements. What is the backwards tracing activity called in requirements traceability?

Options:

A.

Allocation

B.

Lineage tracking

C.

Derivation

D.

Backwards pass

Buy Now
Questions 16

You are a business analyst for your organization and you're working with the stakeholders to identify the primary inputs to the business analysis approach. Which of the following are primary inputs of planning the business analysis approach?

Each correct answer represents a complete solution.

Options:

A.

Organizational process assets

B.

Penalty of not seizing the opportunity

C.

Expert Judgement

D.

Business need

Buy Now
Questions 17

You are currently working on creating the activity list for an initiative in your organization. What characteristic must be assigned to each task in your task list?

Options:

A.

Procurement needs

B.

Risk level

C.

Unique number

D.

Roles and responsibilities

Buy Now
Questions 18

You are the business analyst for your organization. You are currently identifying opportunities for a customer to improve their business processes. The customer wants to streamline their business efforts either through new technologies, better processes, or a combination of both. The customer demands, however, that the solution should not cost more than $300,000 to implement and support for one year. What does the $300,000 represent?

Options:

A.

Budget

B.

Constraint

C.

Solution cost

D.

Requirements

Buy Now
Questions 19

Which approach to business analysis activities deals with rapid delivery of the business value?

Options:

A.

Quality-driven

B.

Change-driven

C.

Plan-driven

D.

Stakeholder-driven

Buy Now
Questions 20

A business analyst has determined that a project should be worth $2,750,000 in four years if her company decides to pursue the project. Assuming the rate of return on the investment is six percent, what is the minimum amount of funds the organization should invest in this project?

Options:

A.

$2,585,000.00

B.

$2,749,001.99

C.

$2,178,257.57

D.

$165,000

Buy Now
Questions 21

You are a business analyst for your organization and you're working with Mary. Mary wants to know what you need to complete the process of planning the business analysis approach if you're already the business analyst for your organization. This approach helps to find out the following except for which one?

Options:

A.

Which stakeholders need to be involved in the decision?

B.

Who will be consulted regarding and informed of the approach?

C.

Who will be observed in job shadowing?

D.

What is the rationale for using it?

Buy Now
Questions 22

You are a business analyst in an organization that has recently embraced business analysis as part of its initiative for new projects. In this organization, there is not an organizational standard for tailoring business analysis duties and expectations. Which one of the following best describes the action you should take to begin business analysis?

Options:

A.

Work with the appropriate stakeholders to determine how the business analysis work should be completed.

B.

Define the organizational standard first.

C.

Create a business case for the need of organizational standards for business analysis.

D.

Take charge and begin the business analysis activities, but document your approach to serve as a template for future business analysis initiatives.

Buy Now
Questions 23

A business analyst (BA) has elicited non-functional information for a system's replacement. In reviewing the elicitation results, the BA finds the number of concurrent users is a large portion of the target user group, which seems high. How should the BA proceed?

Options:

A.

Observe a user performing the task to determine the length of time to complete the task

B.

Document the elicitation results in the solution requirements specification then seek verification and validation in a requirements review

C.

Conduct additional stakeholder analysis to determine whether any additional user groups were overlooked

D.

Confirm elicitation results by researching the actual concurrent users on the existing system and review findings with stakeholders

Buy Now
Questions 24

When a business analyst completes the task of organizing requirements, he is completing two key objectives. What are the two objectives?

Options:

A.

The business analyst should categorize the requirements first by functional or non-functional decomposition and then structure the categories by identified prioritization elements.

B.

The business analyst should strive to find logic in the organizational structure and to establish a prioritization approach on key elements.

C.

The business analyst should aim to understand which models are appropriate for the business domain and solution scope and to identify model interrelationships and dependencies.

D.

The business analyst should work with stakeholders to organize defined categories and then to structure each category by a key performance indicator.

Buy Now
Questions 25

You are the business analyst for your organization and you've identified a business need. In order to satisfy this business need, you believe that your organization will need to hire three electrical engineers, purchase equipment, and likely provide training to existing resources. What process is being described in this scenario?

Options:

A.

Communication needs

B.

Assessment of capability gaps

C.

Resource allocation

D.

Resource procurement

Buy Now
Questions 26

You are the business analyst for your organization. Management has asked you to define and document the requirements of an endeavor so that the requirements may be reused again in the organization. Why would an organization want to re-use requirements?

Options:

A.

Re-using requirements is useful if the organization wants to sell the set of requirements to its customers.

B.

Re-using requirements is useful if the current solution fails.

C.

Re-using requirements is useful when the requirements are something the organization must do on an ongoing basis.

D.

Re-using requirements doesn't mean re-using the requirements over and over, but tracing the requirements to actual deliverables.

Buy Now
Questions 27

The creative thinking process has three values to determine the effectiveness of the process. Which one of the following is not a measurement of effective creative thinking?

Options:

A.

Willingness of stakeholders to accept new approaches

B.

Generation of a pre-determined number of new ideas for a business solution

C.

Application of new ideas to resolve existing problems

D.

The successful generation and productive consideration of new ideas

Buy Now
Questions 28

You are the business analyst for your organization and you're working to identify all of the stakeholders within your organization and outside

your organization to ensure that you've captured the correct requirements for a project. Which one of the following techniques can be best suited for identifying stakeholders?

Options:

A.

Interviews

B.

User stories

C.

Acceptance and Evaluation Criteria

D.

Risk analysis

Buy Now
Questions 29

A business analyst (BA) has determined that “Product Box”, a collaboration game, will provide a fun way to engage the stakeholders when working on prioritizing the list of features. What should the BA do?

Options:

A.

Ensure buy-in from key stakeholders

B.

Send out an agenda in advance

C.

Research ideas for the new product

D.

Consider meeting logistics

Buy Now
Questions 30

You are the business analyst for your organization and you're working with Adam on business analysis processes. Adam allows the business analysis activities and resources to exist in support of the organization. Of the following, what type of business analysis stakeholder is Adam?

Options:

A.

Project manager

B.

Domain subject matter expert

C.

Sponsor

D.

Regulator

Buy Now
Questions 31

Audrey is the business analyst for her organization and she's doing an assessment of the organization's readiness to implement the solution. In her assessment, she's finding that there are conflicting stakeholder groups for and against the proposed solution. Some of the stakeholders have more power over the solution than others. What diagram can Audrey create to visualize the people that are for and against the solution?

Options:

A.

Force field analysis diagram

B.

Tornado diagram

C.

Stakeholder matrix

D.

Pareto chart

Buy Now
Questions 32

A business analyst must consider the business value a solution brings in relation to the cost of implementing the desired solution. Suppliers will often be limited in the amount of requirements they can implement based on the allocated resources. If there are not enough resources to implement all of the solutions, what can the business analyst create to justify the additional funds for the implementation?

Options:

A.

Business case

B.

Cost analysis

C.

Risk assessment with positive risk analysis

D.

Benefits-cost ratio

Buy Now
Questions 33

Beth is a business analyst for her organization and she's completing the tasks in the requirements management and communication knowledge area. As a result of these tasks, she'll create several things for her organization. Which one of the following, however, is not one of the outputs of the requirements management and communication tasks?

Options:

A.

Traced requirements

B.

Requirement management plan

C.

Requirement package

D.

Approved requirements

Buy Now
Questions 34

Jason is creating a business case for his organization and management has asked him to assess the appropriate risks in the business case regarding the solution. Which one of the following risks is not a concern for Jason when defining the business case and associated risks?

Options:

A.

Financial risk

B.

Positive risk

C.

Organizational risk

D.

Technical risk

Buy Now
Questions 35

Complete this sentence in regard to the level of abstraction. Requirements need to sayneeds to be done, notto do it.

Options:

A.

What, when

B.

Requirements, who needs

C.

What, how

D.

Requirements, how much

Buy Now
Questions 36

The business need is considered to be the most critical step in the business analysis effort. Why is the definition of the business need considered the most critical step?

Options:

A.

The business need defines the problem the business analyst is finding a solution for.

B.

The business need defines the solution for the business problem.

C.

The business need takes the longest time and costs most of the business analysis efforts.

D.

The definition of the business need determines future solutions, stakeholders, and approaches.

Buy Now
Questions 37

By which of the following is the performance of all requirements management and communication activities governed?

Options:

A.

Business analysis plans

B.

Business analyst

C.

Project manager

D.

Project sponsor

Buy Now
Questions 38

Which one of the following terms is not a business analysis planning and monitoring approach?

Options:

A.

Structured walkthroughs

B.

Decision analysis

C.

Requirements elicitation

D.

Process modeling

Buy Now
Questions 39

You are the business analyst for your organization and you've been working with several stakeholders to

gather requirements for approval.

The requirements have been approved with the exception of a conflict on one requirement. What must you and the stakeholders do in regard to this conflict before the business analysis endeavor may continue?

Options:

A.

The requirement with the conflict should be excluded from the approved set of requirements and must be resolved before it can be joined to the approved set of requirements.

B.

The conflict must be documented as a risk.

C.

The conflict must be resolved before the set of requirements may be approved.

D.

The conflict must be documented in an issues log, assigned to an issue owner, and then the endeavor may continue.

Buy Now
Questions 40

You are the business analyst for your organization and you are working with Bill on creating a model. Bill is a little confused about all the different things a model can do for the stakeholders. You explain to Bill that a model can do all of the following except for which one?

Options:

A.

Define the risk and reward for the requirements

B.

Categorize and create hierarchies of items

C.

Define boundaries for business domains

D.

Show business logic

Buy Now
Questions 41

You have been assigned as the Project Manager for a new project that involves the development of a new interface for your existing time management system. You would like to plan the communications that need to be made during the project lifecycle. Which of the following would be a critical tool/technique to help in your communications planning?

Options:

A.

RAM Chart

B.

Affinity Diagram

C.

Stakeholder Analysis

D.

Text-Oriented Chart

Buy Now
Questions 42

Which stakeholder in the solution assessment task will provide information on technical constraints that could limit the solutions that may be implemented?

Options:

A.

Project manager

B.

Suppliers

C.

Sponsor

D.

Operational support

Buy Now
Questions 43

You are the business analyst for your organization and you're using a plan-driven approach to business analysis processes. In this environment, what types of communications are most likely required to be used in regard to requirements?

Options:

A.

Informal

B.

Ad hoc

C.

Face-to-face

D.

Formal

Buy Now
Questions 44

Complete this sentence. If a requirement cannot be verified, it cannot be successfully.

Options:

A.

Scheduled

B.

Estimated

C.

Assigned

D.

Implemented

Buy Now
Questions 45

All of the following are inputs to the task assess organizational readiness except for which one?

Options:

A.

Enterprise architecture

B.

Solution Scope

C.

Stakeholder concern

D.

Risk register

Buy Now
Questions 46

High quality requirements have certain characteristics which distinguish them from low-quality requirements. Which characteristic of requirements demands that all requirements in a set or model support its overall purpose and scope?

Options:

A.

Complete

B.

Cohesive

C.

Correct

D.

Consistent

Buy Now
Questions 47

You are the business analyst in your organization and you're working to organize the requirements for the business units in your company. Which technique is best suited for structuring requirements around the needs of each stakeholder group?

Options:

A.

Organizational modeling

B.

User stories

C.

Data modeling

D.

Functional decomposition

Buy Now
Questions 48

The project plan called for deliverables to be handed over at the end of the project. Although the client's business team was satisfied, the client's technical team was extremely resistant to this approach. What could the business analyst (BA) do to mitigate the technical team’s resistance?

Options:

A.

Escalate to project sponsor

B.

Meet with technical team

C.

Reassess the project objectives

D.

Email the business team

Buy Now
Questions 49

You are the business analyst for your organization and you're working with several stakeholders to identify, manage, and approve requirements. Your organization requires using a plan-driven approach to business analysis and changing management. In this approach, who is most likely to approve changes to requirements?

Options:

A.

Change control board

B.

Requirements owner

C.

Project sponsor

D.

Project manager

Buy Now
Questions 50

You are the business analyst for your organization and are working on organizing the identified requirements for a new solution. Nancy, your assistant in this process, says that these requirements aren't very complex. You agree but add that it's this thing that makes the overall solution complex. What thing adds to the level of complexity among requirements?

Options:

A.

Relationships among the requirements

B.

Management in the project

C.

Cost and schedule constraints

D.

Stakeholders in the project

Buy Now
Questions 51

There are three inputs needed to determine the solution approach process. What are these inputs?

Options:

A.

Business need, organizational process assets, and enterprise environmental factors

B.

Business need, enterprise environmental factors, and required capability

C.

Business need, organizational process assets, and assumptions

D.

Business need, organizational process assets, and required capability

Buy Now
Questions 52

When a business analyst assists in the planning of the solution implementation, she must always consider the constraints for implementation. Which one of the following cannot be considered as an implementation constraint?

Options:

A.

Weather

B.

Freeze periods

C.

Company policies

D.

Business cycle timings

Buy Now
Questions 53

All of the following statements are true regarding a brainstorming session during requirements elicitation except for which one?

Options:

A.

All ideas should be visibly recorded.

B.

The number of ideas should not be limited.

C.

The ideas should be generated with a cost or time estimate.

D.

All ideas should be shared without any discussion, criticism, or evaluation.

Buy Now
Questions 54

Which approach is best to take when a business analyst is assessing the solution options for a business need when there are relatively few criteria involved?

Options:

A.

Focus on the life cycle costs of the solutions.

B.

Focus on the commonalities of the solutions.

C.

Focus on the differences of the solutions.

D.

Focus on the implementation cost of the solutions.

Buy Now
Questions 55

Henry is meeting with Janet, the business analyst of the organization. They are discussing an opportunity to create a new service their company can provide, though the startup of the service would take time and an investment. Henry wants Janet to explore the possibility of this new venture. What activity is Henry asking Janet to complete?

Options:

A.

Brainstorm the business need.

B.

Create a data diagram for the service.

C.

Define the business need.

D.

Elicit the requirements of the proposal.

Buy Now
Questions 56

Which of the following is used to define and document the business analysis approach?

Options:

A.

Structured walkthrough

B.

Progressive elaboration

C.

Process modeling

D.

Decision analysis

Buy Now
Questions 57

A business analyst is meeting with the customer of the project. The customer tells the business analyst that she can only allow the budget of $575,000 for the project. This budget is best described as what type of constraint?

Options:

A.

Technical constraint

B.

Verified constraint

C.

Financial constraint

D.

Business constraint

Buy Now
Questions 58

Which of the following are not appropriate for a plan-driven business analysis approach? Each correct answer represents a complete solution.

Options:

A.

Informal

B.

Face-to-face

C.

Ad hoc

D.

Formal

Buy Now
Questions 59

You are the business analyst for your organization and your manager has asked you to prepare an analysis of each proposed solution. Your manager wants you to determine whether and how eachoption can provide an expected business benefit to meet the stated business need. What is your manager asking you to create?

Options:

A.

Feasibility study

B.

Abbreviated study

C.

Alternative identification analysis

D.

Quantified analysis

Buy Now
Questions 60

Which of the following documents graphically depicts the project team members and displays their interrelationship for a specific project?

Options:

A.

Project team directory

B.

Project organization chart

C.

Project scope statement

D.

Project charter

Buy Now
Questions 61

A business analyst in her organization has identified all of the terminology of the solution, the acronyms the organization will use, and the nomenclature of her department where the endeavor will take place. Where should all of this information actually be stored?

Options:

A.

WBS

B.

Business analysis register

C.

Terminology register

D.

Data dictionary

Buy Now
Questions 62

Henry is a business analyst in his organization and he's asked an expert to help him determine the best business analysis duties to implement. Why would Henry ask an expert to help him define the business analysis duties?

Options:

A.

Henry is a new business analyst.

B.

Henry should always use expert judgment to confer on the business analysis approach.

C.

Henry is using an expert to help save time.

D.

Henry can use expert judgment to determine the optimal business analysis approach.

Buy Now
Questions 63

You are the business analyst for your organization and you're working with your stakeholders to assess the organization's readiness for the solution. As part of this assessment, you'll perform a cultural assessment. What is the purpose of this assessment?

Options:

A.

To determine how the culture may affect the solution

B.

To determine if the stakeholders genuinely want the change to be successful

C.

To determine if the change is feasible in the environment

D.

To determine how the solution affects the stakeholders' culture

Buy Now
Questions 64

Bob and Susan are business analysts for their organization. They are examining two materials that could be used in an upcoming project.

They are testing the materials and measuring the results of each test to compare the materials to each other. This process will help Bob and Susan determine which material is best for their upcoming project. What type of process are Bob and Susan completing with these materials?

Options:

A.

Stress test

B.

Feasibility study

C.

Benchmarking

D.

Alternative identification

Buy Now
Questions 65

In order to plan business analysis activities, you will need four inputs. Which one of the following inputs is not valid for this task?

Options:

A.

Business analysis approach

B.

Stakeholder tolerance for risk

C.

Stakeholder list, roles, and responsibilities

D.

Business analysis performance assessment

Buy Now
Questions 66

A business analyst wants to use benchmarking, but the project manager recommends against the approach. There are, as the project manager points out, several disadvantages to benchmarking. Which one of the following is not a disadvantage to benchmarking?

Options:

A.

Discovery of new approaches

B.

Time consumption

C.

Requirement of expertise of the person conducting the study

D.

Inability to produce innovative solutions

Buy Now
Questions 67

As a business analyst, you must identify activities in your business analysis approach. Which one of the following is useful for identifying activities?

Options:

A.

Project management input

B.

BABOK

C.

A list of deliverables

D.

WBS

Buy Now
Questions 68

A new contract requires a thorough level of documentation to be developed and maintained with planned phases of reviews and authorized sign offs. Which approach fits this contract?

Options:

A.

Waterfall

B.

Agile

C.

Scrum

D.

Iterative

Buy Now
Questions 69

A business analyst (BA) has elicited the following requirement; "The solution must ensure the portal response times are under 2 seconds." What requirement classification schema does this requirement belong to?

Options:

A.

Nonfunctional requirements

B.

Stakeholder requirements

C.

Transitional requirements

D.

functional requirements

Buy Now
Questions 70

A new regulation results in organizations needing to change online contractual wording. A business analyst (BA) has elicited the requirements and documented them in a change control request Where will the BA find out which stakeholder has the authority to approve, deny, or defer the change request?

Options:

A.

Information management approach

B.

Governance approach

C.

Business analysis approach

D.

Stakeholder engagement approach

Buy Now
Questions 71

The Chief Executive Officer (CEO) of a company presents a new corporate strategy that will introduce a new system to the organization. The CEO has expressed a concern about the impact to the staff once the strategy has been implemented. What must the business analyst (BA) do to address concerns of the CEO?

Options:

A.

Identify required cultural changes

B.

Perform a cost-benefit analysis of the strategy

C.

Ensure requirements are easily accessible

D.

Align the new capabilities to the company's architecture

Buy Now
Questions 72

A business analyst (BA) is designing solutions for a set of requirements and finds that there is an opportunity to improve the operations of the business. Which of the following is an opportunity for improvement the BA could recommend?

Options:

A.

Create a solution by constructing a number of solution components to meet the requirements

B.

Enable the solutions that will satisfy the highest priority requirements and stakeholder needs

C.

Provide information to staff so they can answer customer inquiries directly themselves

D.

Purchase software that contains features that are not currently required but are included for free

Buy Now
Questions 73

An organization's board of directors has funded a new mobile application to support external customers. The business case was developed with emphasis on objectives to broaden the organization's brand and increase customer engagement. The business analyst (BA) is reviewing a group of user stories with the product owner. One of these user stories is: "As a customer service representative, I need to enter my time on the mobile application so that I can leave work to pick up my sick daughter from school". The product owner wants to take advantage of this opportunity to provide the staff a way to enter their time away from the office and create an interface to the Payroll application. How must the BA evaluate alignment with the existing scope?

Options:

A.

Add me functionality to the list of requirements

B.

Suggest that the story be included with a change to solution scope or be removed

C.

Ask product owner to rank this user story against the existing product backlog

D.

Review business objectives and determine potential value

Buy Now
Questions 74

The claims intake workflow of an insurance company is being standardized across all branch offices. The business analyst (BA) assigned to this project has interviewed users individually in all the offices and plans to schedule a workshop with all the users. What should the BA do to prepare for the workshop?

Options:

A.

Create a process model

B.

Develop a work breakdown structure

C.

Build an entity-relationship diagram

D.

Construct a decision tree

Buy Now
Questions 75

A business analyst (BA) is working on a project for a media company. The BA has verified, validated, and prioritized the requirements based on business benefits. During the development phase, the team discovered that the current viewer will no longer be supported by the provider. The technical team needs to either upgrade to the newer version with different technology or find an alternate viewer. Given this new information, what is the next step for the BA?

Options:

A.

Assess the impacts and re-prioritize the requirements based on technical constraints

B.

Continue the project as it is currently important to focus on customer satisfaction

C.

Convince stakeholders that the business benefits are unachievable due to technical constraints

D.

Communicate the technical constraints to customers

Buy Now
Questions 76

A deployed loan product was funded with the expectation of prepayment risk reduction. Initially key performance indicators would be to take similar loan prepayment rates over the previous 10-year period and compare it with the new product. After implementation, the business analyst (BA) determines that the decade old housing market is vastly different. Which of the following should the BA consider for validity of performance measures?

Options:

A.

Currency

B.

Timing

C.

Sample size

D.

Frequency

Buy Now
Questions 77

A business owner has identified a high priority requirement that needs to be implemented immediately. The project manager has asked the business analyst (BA) to perform an impact analysis of this change. Which factor will the BA need to consider?

Options:

A.

Number of systems being affected by the requirement

B.

Original source of the requirement

C.

Method of requirement communication

D.

Selection of the elicitation for the requirement

Buy Now
Questions 78

A business analyst (BA) is facilitating a meeting with subject matter experts (SMEs) in which the SMEs are answering questions about the major business processes and associated activities the business performs. The BA will create a deliverable from this discussion that will assist in defining scope. What technique is the BA using?

Options:

A.

Decision modelling

B.

SWOT analysis

C.

Mind mapping

D.

Functional decomposition

Buy Now
Questions 79

An organization has hired a consulting firm to implement and customize a software solution they purchased. The firm has raised concerns regarding the effort required to develop a solution that meets all requirements. On what basis should the requirements be prioritized in this context?

Options:

A.

Benefit

B.

Cost

C.

Risk

D.

Penalty

Buy Now
Questions 80

A project manager (PM) is planning the project timelines along with a business analyst (BA) and they come across the task of requirement allocation. The PM wants to know what the dependencies are before the requirement allocation task is initiated and seeks the BA's advice. Which of the following is a dependency that the BA will highlight as a predecessor for requirement allocation?

Options:

A.

Requirements architecture is approved

B.

Design options are available

C.

Solution approach has been determined

D.

Requirement are validated

Buy Now
Questions 81

After a walk-through of the requirements specification with the business users, the group determines that five requirements are now mandatory due to new government regulations. What should the business analyst (BA) do following the meeting?

Options:

A.

Update the priority of the requirements and record the reason for doing so

B.

Ask the test analyst to ensure that test cases are only written to cover the new requirements

C.

Escalate the decision to the project manager to confirm with all users again

D.

Help the system analyst create a prototype of the requirements to demo to the users

Buy Now
Questions 82

The Chief Information Officer (CIO) of a large financial services firm with many technology applications was formally reviewing all ongoing projects and noticed that the requirements were complex and difficult to follow. The CIO asks the business analyst (6A) what would improve the stakeholder's ability to understand the requirements. Which of the following will improve the requirements quality?

Options:

A.

Traceability matrices

B.

IEEE /ISO 29148 requirements standards

C.

Additional requirements attributes

D.

Matrix documentation formats

Buy Now
Questions 83

A project has experienced several schedule delays. A business analyst (BA) is assigned to the project to help get it back on track. The project manager believes that incomplete requirements are causing the missed milestones. What tool will help address the project manager's concern?

Options:

A.

Risk review

B.

Quality control checklist

C.

Decision analysis

D.

Communication plan

Buy Now
Questions 84

A software company wants to make a gradual change from its traditional way of developing requirements to a more adaptive approach. A business analyst (BA) is hired to quantify the probability that the solution will meet the company’s needs and assess the relevant risks. Which element of risk assessment does the BA need to consider?

Options:

A.

Issue management

B.

Negative impact to value

C.

Risk tolerance

D.

Positive evaluation results

Buy Now
Questions 85

A deployed loan product was funded with the expectation of prepayment risk reduction. Initially, key performance indicators (KPIs) would be to take similar loan prepayment rates over the previous 10-year period and compare them with the new product. After implementation, the business analyst (BA) finds that the decade-old housing market is vastly different. Which of the following should the BA consider for validity of performance measures?

Options:

A.

Sample size

B.

Frequency

C.

Timing

D.

Currency

Buy Now
Questions 86

A business analyst (BA) is preparing an analysis approach to replace a 12-year-old air traffic control system. The BA aims to define the solution definition before implementation, capture theinformation in standardized templates, and ensure that all activities are identified first and then divided into tasks. Which approach provides the appropriate level of formality for this project?

Options:

A.

Reactive

B.

Adaptive

C.

Proactive

D.

Predictive

Buy Now
Questions 87

The Chief Information Officer (CIO) of a large financial services firm with many technology applications was formally reviewing all ongoing projects and noticed that the requirements were complex and difficult to follow. The CIO asks the business analyst (BA) what would improve the stakeholder's ability to understand the requirements. Which of the following will improve the requirements quality?

Options:

A.

Traceability matrices

B.

Additional requirements attributes

C.

Matrix documentation formats

D.

ISO 29148 requirements standards

Buy Now
Questions 88

A business analyst (BA) is working on a project to implement a commercial off-the-shelf (COTS) application for tracking customers. In an observation session with a domain subject matter expert (SME), the BA notes that the SME keeps separate records for the customers who are also vendors. The BA knows that the new software has a module for vendor management that would integrate the vendor and customer records. Which type of opportunity has the BA identified?

Options:

A.

Potential to provide future value supported by the system

B.

Ability to provide greater amounts of information to staff

C.

Elimination of duplicate tasks performed by staff

D.

Automation to increase consistency of behavior

Buy Now
Questions 89

A key stakeholder has requested an extensive range of performance measures for a replacement workflow system. A business analyst (BA) has decided to work closely with the stakeholder to validate the performance measures requested. The BA will be ensuring that the performance measures:

Options:

A.

Align to industry benchmarks gathered for similar solution implementations.

B.

Align with other measures within the broader context of the solution.

C.

Are either qualitative or quantitative measurements, but not both.

D.

Are written in the correct format using the agreed standards.

Buy Now
Questions 90

The business analyst (BA) is investigating techniques that would be appropriate for determining how and who uses data across the identified processes. Which technique should the BA select?

Options:

A.

CRUD (Create, Read, Update, and Delete) matrix

B.

Stakeholder list, map, or personas

C.

Data dictionary

D.

Decision model

Buy Now
Questions 91

Two stakeholders are arguing over which model to use for requirements. One insists that using an activity diagram is superior, while the other prefers a state diagram. How should the business analyst (BA) resolve the conflict?

Options:

A.

Suggest a fusion model that integrates activity and state diagrams

B.

Explain that the models are complementary to each other

C.

Allow both stakeholders to work on the models independently

D.

Introduce a third model type so that neither stakeholder prevails

Buy Now
Questions 92

In a project meeting, stakeholders presented conflicting views on how the business analysis process should be conducted, leading to the sponsor becoming very upset. If a similar situation arises in the future, what can the business analyst (BA) do to avoid the situation?

Options:

A.

Develop a clearer RACI matrix

B.

Communicate with each stakeholder individually

C.

Obtain stakeholder signoff on the approach

D.

Obtain approval for the business case

Buy Now
Questions 93

An organization's Business Analysis Center of Excellence (BACoE) has deployed several business analysts (BAs) to provide business analysis to a cross-functional initiative. After the first phase of the project, the BACoE seeks to determine the effectiveness of the businessanalysis work. Which of the following techniques could be used to elicit feedback from all affected stakeholders?

Options:

A.

Brainstorming

B.

Surveys

C.

Business cases

D.

Root cause analysis

Buy Now
Questions 94

A long-established company selling ice cream is entering its crucial sales period leading up to summer. Based on the company's risk tolerance, a business analyst (BA) has advised against replacing the most popular flavors with new untested flavors. What is the company's attitude toward risk, as assessed by the BA?

Options:

A.

Risk-optimizing

B.

Risk-neutral

C.

Risk-averse

D.

Risk-seeking

Buy Now
Questions 95

A business analyst (BA) is tasked with performing a gap analysis between two existing systems to combine into a single system or run just one system. Which of the following modeling formats will show the requirements for both systems side by side?

Options:

A.

Bubble Chart

B.

Activity Flow

C.

Glossary

D.

Matrix

Buy Now
Questions 96

A facilities management company has an ambitious growth plan of doubling the revenue of their office waste recycling service over the next 12 months. The business analyst (BA) plans to define the objectives and align them with the enterprise’s vision, mission, and goals. What element of 'SMART' goals would this objective refer to?

Options:

A.

Relevant

B.

Measurable

C.

Specialized

D.

Achievable

Buy Now
Questions 97

A business analyst (BA) is supporting an organization in its product launch. The BA wants to identify assumptions about the benefits resulting from the new product. What does identifying assumptions help the BA manage?

Options:

A.

Metrics

B.

Requirements

C.

Priorities

D.

Risks

Buy Now
Questions 98

The director of a furniture store manages a group of skilled carpenters who make furniture from locally available materials. The director decides to automate its inventory processes so that the carpenters can place orders for raw materials themselves. A business analyst (BA) is engaged to define the requirements and propose options for commercial off-the-shelf (COTS) inventory management solutions. After meeting with the director, the BA needs to schedule a workshop with the carpenters to:

Options:

A.

Investigate whether automation is a constraint for the end users.

B.

Demonstrate some of the proposed solutions to end users.

C.

Convey the benefits of the automation to the end users.

D.

Present the proposed future state to the end users.

Buy Now
Questions 99

A project is being initiated to enhance an online product because sales have declined for over a year. The company leaders are confident that all of the skills needed to improve the product exist within the company. By enhancing the product, sales will increase, and new customers will emerge. A business analyst (BA) will help the enhancement project by first:

Options:

A.

Identifying the stakeholders

B.

Implementing a suitable solution

C.

Documenting the requirements

D.

Evaluating the business need

Buy Now
Questions 100

During planning, elicitation, and sign-off of requirements, the stakeholders felt that their opinions were not heard and information was not frequently shared. What major competency was lacking in this process?

Options:

A.

Communication

B.

Information

C.

Collaboration

D.

Trustworthiness

Buy Now
Questions 101

The product backlog refinement meeting for a project is complete, but two stakeholders do not agree on the priority of several product backlog items. What should the business analyst (BA) do to help move the project forward?

Options:

A.

Notify the project manager.

B.

Confirm the authority of the two stakeholders.

C.

Apply the previous backlog priority.

D.

Schedule a walkthrough with the two stakeholders.

Buy Now
Questions 102

A lead business analyst (BA) has received negative feedback on the deliverables produced by BAs in the organization. A major concern was ambiguous requirements. What technique will help ensure business analysis information is clear and understandable?

Options:

A.

Ensure all requirements are testable

B.

Choose the appropriate format to communicate requirements

C.

Align test scenarios with business needs

D.

Use checklists for quality control

Buy Now
Questions 103

The claims intake workflow of an insurance company is being standardized across all branch offices. The business analyst (BA) assigned to this project has interviewed users individually in all the offices and plans to schedule a workshop with all the users. What should the BA do to prepare for the workshop?

Options:

A.

Construct a decision tree

B.

Build an entity-relationship diagram

C.

Create a model

D.

Develop a work breakdown structure

Buy Now
Questions 104

Before selecting a design solution, a company wants to ensure that stakeholder, solution, and transition requirements align with the business requirements and also that the design satisfies the requirements. What process is the business analyst (BA) completing?

Options:

A.

Requirements Validation

B.

Requirements Verification

C.

Requirements Elicitation

D.

Requirements Engineering

Buy Now
Questions 105

A business analyst (BA) is defining a stakeholder approval approach for the requirement deliverables. The project involves implementing new government regulatory requirements with significant risk to the organization in case of non-compliance. According to the BABOK® Guide, what will the BA need to do?

Options:

A.

Use a rigorous approval process of detailed specifications.

B.

Ensure the document is completed and signed off.

C.

Use an informal approval process to speed up delivery.

D.

Ensure high-level user stories are completed and accepted.

Buy Now
Questions 106

A business analyst (BA) is working on a project that has a release date that cannot be changed. The BA engaged with stakeholders and completed the business requirements elicitation task. Upon review with the rest of the project team, it is determined that not all requirements can be implemented by the set deadline. What must the BA do to ensure maximum business value?

Options:

A.

Ensure test scenarios conform to business requirements

B.

Align business requirements to organizational strategy

C.

Analyze requirements to remove unnecessary components

D.

Choose an appropriate format to communicate requirements

Buy Now
Questions 107

A business analyst (BA) working with a large insurance corporation interviewed an industry thought leader who predicted that many of the regulations currently imposed by the government will change very soon. The BA carefully documented all these inputs from the thought leader because it will impact many of the strategic initiatives of the insurance company. What specific element of requirement validation is being executed by the BA?

Options:

A.

Identify constraints

B.

Define measurable evaluation criteria

C.

Identify assumptions

D.

Evaluate alignment with solution scope

Buy Now
Questions 108

A system owner calls the project team to inquire about a recent change in one of the requirements, and insists that the change was never requested. What should the project team do to investigate the issue?

Options:

A.

Record a defect for fixing

B.

Consult with the project manager

C.

Revert back the changes

D.

Check the audit history of changes

Buy Now
Questions 109

A business analyst (BA) is conducting a workshop with the purpose of analyzing a business process. Stakeholders of different business units are in attendance. Each stakeholder is able to explain their unit's contribution to the process, however, there is no end to end process owner who can provide a consolidated view. Which technique should the BA use to compare the stakeholder's inputs against each other in order to check for consistency and omissions?

Options:

A.

Schedule a follow-up workshop to give more time for additional input

B.

Create a use case scenario that describes the process step by step

C.

Develop a process model with swimlanes to highlight the handoff points

D.

Create a logical data model with the information elicited

Buy Now
Questions 110

A business analyst (BA) has completed documenting requirements and to save time, recommends sharing the requirements document with the development team to fast-track development immediately. What issue may arise by doing so?

Options:

A.

Stakeholders may refuse the solution.

B.

Requirements metrics may not be measurable.

C.

The BA may significantly impact other aspects of the project timeline.

D.

The business need may change.

Buy Now
Questions 111

A business analyst (BA) is creating a business process model (BPM) showing how the organization will handle errors reported on its website. The BA held a workshop with stakeholders about how the process might work. The BA was also given an instruction manual about a similar error-handling situation, but was advised that some minor aspects are not applicable to the new process. How can the BA use the manual?

Options:

A.

Ignore the manual's information when creating the BPM since it is about a different situation

B.

Identify the discrepancies in process between the manual and the workshop results and resolve these with stakeholders

C.

Create a new version of the manual based on the original

D.

Rely on the manual to create the BPM and ignore the interview results because no single stakeholder has the whole picture of the process

Buy Now
Questions 112

An organization's Business Analysis Center of Excellence (BACoE) has deployed several business analysts (BAs) to provide business analysis to a cross-functional initiative. After the first phase of the project, the BACoE seeks to determine the effectiveness of the business analysis work. Which of the following techniques could be used to elicit feedback from all affected stakeholders?

Options:

A.

Brainstorming

B.

Business cases

C.

Surveys

D.

Root cause analysis

Buy Now
Questions 113

During a requirements elicitation workshop, a stakeholder raises an issue that is outside of the project's scope. The business analyst (BA) facilitating the workshop should:

Options:

A.

note the issue in the Issue Register to be considered by the Project Manager.

B.

ignore the stakeholder's comment and proceed with the agenda.

C.

consider the issue's impact on the project and gain agreement with stakeholders on the next step.

D.

request the stakeholder to explain the issue further so that possible solutions can be discussed.

Buy Now
Questions 114

A business analyst (BA) is developing the requirements for an inventory management system. Some current accounting processes are automated but other departments like purchasing, marketing, sales and distribution departments work in isolation and have a manual process. They extensively use spreadsheets to maintain the transactions and at the end of the day the department managers manually verify and reconcile transactions before supplying the information to the accounting department. In order to verify and validate the elicited requirements, the BA will need to prepare a:

Options:

A.

single process model on automation for all stakeholders.

B.

database structure in the viewpoint of the selected stakeholders

C.

list of requirements in a spreadsheet for all stakeholders.

D.

set of process models in the viewpoint of the selected stakeholders.

Buy Now
Questions 115

A passport agency has recently deployed an online system where customers can apply for, amend, and renew passports. The expected volumes have not been realized and as a result, the agency has not achieved the projected savings. A business analyst (BA) has been asked to investigate the potential causes of this shortfall by understanding the trends, patterns. and volumes at a detailed level. What method of requirements elicitation should the BA start with?

Options:

A.

Data Mining

B.

Mind Mapping

C.

Business Rules Analysis

D.

Interviews

Buy Now
Questions 116

A business analyst (BA) is assessing risks on a project addressing the implementation of a new web portal. Which of the following would the BA classify as a project risk?

Options:

A.

Customer service ratings will increase with the new system

B.

Current infrastructure may not support increased performance

C.

Expenditures are currently below budgeted estimates

D.

Support calls will increase if the change is not performed

Buy Now
Questions 117

The business analyst (BA) has prepared a requirements package and it is now ready to present to the stakeholders. What is the purpose of presenting the package?

Options:

A.

To document the project's completion

B.

To define the analysis approach

C.

To verity the project's progress

D.

To ensure a shared understanding of the information

Buy Now
Questions 118

Several user groups are impacted by a proposed change to their daily work flow. How should the business analyst (BA) convey these changes so that the user groups understand the impact?

Options:

A.

Develop a data model diagram

B.

Create business process models

C.

Write functional requirements

D.

Establish a communication plan

Buy Now
Questions 119

A business analyst (BA) is compiling information about different approaches that will meet solution

requirements in order to make a recommendation for solution design. To evaluate whether externally available solutions meet the requirements, which of the following will the BA create and distribute?

Options:

A.

Statement of Work (SOW)

B.

Rough Order of Magnitude (ROM)

C.

Request for Information (RFI)

D.

Work Breakdown Structure (WBS)

Buy Now
Questions 120

A business analyst (BA) is tasked with developing requirements that can be implemented by the development team iteratively. Which characteristic should the requirements exhibit?

Options:

A.

Substantial

B.

Granular

C.

Prioritized

D.

Unambiguous

Buy Now
Questions 121

The business analyst (BA) has completed the verification of a set of requirements, but a change in scope has materialized. Which technique should the BA use to obtain consensus and reach agreement among the stakeholders?

Options:

A.

Financial analysis

B.

Business rules analysis

C.

Decision analysis

D.

Risk analysis and management

Buy Now
Questions 122

A project's business requirements require that the new solution reduce the labor costs currently attributed to performing end of month accounting procedures. Currently the company routinely must pay overtime to meet the deadline. The business analyst (BA) has been documenting the process and wants to ensure that the approach to the process design is feasible for the staff who perform the end of month procedures. Which of the following stakeholders will provide this verification?

Options:

A.

Implementation subject matter expert

B.

Domain subject matter expert

C.

Operational support

D.

Project sponsor

Buy Now
Questions 123

A business analyst (BA) has been spending the majority of the past week cataloguing the new, removed, and modified components of an upcoming project. What is the main purpose of the BA performing this work?

Options:

A.

To establish the key performance indicators

B.

To define the future state

C.

To identify the domain subject matter expert

D.

To document the current state

Buy Now
Questions 124

A business analyst (BA) is identifying the functions and features required for a new enterprise software solution. The BA reviews historical documents about the current business processes and then interviews each stakeholder group, individually, asking Questions about current business processes. The BA compares the information obtained during the stakeholder interviews with the information gathered from the historical documents. Which activity is the BA performing with this approach?

Options:

A.

Verification of requirements

B.

Validation of requirements

C.

Confirmation of elicitation results

D.

Capture of elicitation outcomes

Buy Now
Questions 125

A one-location restaurant has been a huge success and the owner wants to expand into more markets. The owner wants to ensure that the quality of the food and pleasing atmosphere is maintained without introducing new variables. Working with the key members of the organization, the owner determines that training and standard processes must be defined. The owner engages a business analyst (BA) to create training materials and operating procedures based on the existing processes at the original restaurant. During this documentation, the BA identifies some opportunities for improvement. How must the BA proceed?

Options:

A.

Schedule time with the owner to review any opportunities to improve existing processes and obtainpermission to include changes before documenting

B.

Create documentation based on the observed processes because improvements are outside of the scope of the project

C.

Provide documentation of improved procedures based on the observed opportunities for then new location

D.

Perform benchmarking and market analysis to determine whether there are standard procedures in the restaurant industry that support the opportunities identified

Buy Now
Questions 126

Requirements have been prioritized in the product backlog for inclusion in the upcoming release. One of the project team members fears that at least one requirement from the prioritization list is not finalized and still requires further analysis. Which of the following factors describe the affected requirement?

Options:

A.

Benefit

B.

Dependency

C.

Stability

D.

Risk

Buy Now
Questions 127

A business analyst (BA) is working on a project to provide a temporary solution that will last for two months. The BA is feeling overwhelmed with the work needed to create the huge number of links to provide full traceability from solution requirements to design for this solution. How can the BA justify omitting all possible links?

Options:

A.

Such traceability is at a lower level of abstraction for this project

B.

The value each link is delivering in this situation is not high

C.

Traceability is a low priority as the BA has other work to complete

D.

It is impossible for anyone to confirm if such links are correct

Buy Now
Questions 128

A business analyst (BA) is preparing the elicitation activity plan for a project. How will understanding the elicitation scope assist the BA with the elicitation activity?

Options:

A.

By ensuring the requirements are validated in time

B.

By demonstrating how to record elicitation results

C.

By outlining the level of stakeholder collaboration

D.

By determining when elicitation is complete

Buy Now
Questions 129

There are competing needs from the different business areas that will use a new system. The business analyst (BA) sets up a weekly meeting with a structured agenda to review the total effort, cost, business impact and risk of each requirement with the business leads to determine what is included in each release of the solution. What approach has the BA defined?

Options:

A.

Prioritization approach

B.

Communication approach

C.

Collaboration approach

D.

Traceability approach

Buy Now
Questions 130

A client wants to rehire a business analysis consulting firm for another project. The assigned business analyst (BA) developed a good rapport with the stakeholders, but delivered documents that contained lots of technical jargon that the client could not fully understand. Based on the feedback, the consulting company should:

Options:

A.

recommend a new methodology which is the latest trend in the industry.

B.

assign a different BA to the project.

C.

discuss the feedback during the brainstorming sessions after project completion.

D.

identify performance metrics before commencing work.

Buy Now
Questions 131

Kelly is the business analyst for her organization and she's identifying roles and responsibilities of the people involved in business analysis activities. Her manager has asked Kelly to create the RACI matrix to accomplish this task. What is the RACI matrix?

Options:

A.

The RACI matrix is a roles and responsibilities chart that uses the legend of Responsible, Action, Controlled, and Informed.

B.

The RACI matrix is a roles and responsibilities chart that uses the legend of Role, Action, Controlled, and Information.

C.

The RACI matrix is a roles and responsibilities chart that uses the legend of Responsible, Accountable, Consulted, and Informed.

D.

The RACI matrix is a roles and responsibilities chart that uses the legend of Risk, Action, Cost, and Information.

Buy Now
Questions 132

You are the business analyst for your organization and you're working with the key stakeholders to validate the requirements. In your review, you have determined the business value of each requirement and you've discovered three requirements that do not deliver direct or indirect value to the stakeholders. What should you do with these requirements?

Options:

A.

Determine their purpose in the requirements set.

B.

Justify their existence.

C.

See if the requirements are integrated with other requirements.

D.

Remove them from the requirements set.

Buy Now
Questions 133

Brian is the business analyst for his organization and he's hosting a brainstorming session. He is facilitating the session with eight stakeholders. Why is it important for Brian to not set a goal for the number of ideas the group should generate in the session?

Options:

A.

A goal for the number of ideas to be generated should be created.

B.

A goal for the number of ideas puts too much pressure on the group.

C.

A goal for the number of ideas may be too large to reach.

D.

A goal for the number of ideas actually limits the ideas that can be generated.

Buy Now
Questions 134

You are the business analyst for your organization. On your current project you'll be using the change-driven approach for defining requirements and gathering feedback. Which of the following statements best describes the change-driven approach?

Options:

A.

The change-driven approach favors defining requirements through experimentation.

B.

The change-driven approach favors defining requirements standardized templates.

C.

The change-driven approach favors defining requirements through team interaction.

D.

The change-driven approach does not define the requirements until after a solution for the problem has been identified.

Buy Now
Questions 135

Which of the following is the best definition of the business rules analysis?

Options:

A.

To define the historical information that is available for the business analyst to rely on for his research.

B.

To define the rules that govern decisions in and organization and that define, constrain, or enable organizational policies.

C.

To define the people that govern decisions in and organization and that define, constrain, or enable organizational policies.

D.

To define the job functions, roles and responsibilities, and the designation of power among the project stakeholders.

Buy Now
Questions 136

Which one of the following statements best describes what an assumption is?

Options:

A.

These are the things that may restrict the options for the endeavor.

B.

The weather will always be hot in the summer and cool in the winter.

C.

The project must be completed by December 18.

D.

These are things that are believed to be true, but they have not yet been confirmed.

Buy Now
Questions 137

In order to assess the capability gaps of an organization, you'll need all of the following inputs except for which

one?

Options:

A.

Solution performance assessment

B.

Enterprise architecture

C.

Solution scope

D.

Business need

Buy Now
Questions 138

Your organization is using a plan-driven approach to business analysis. What must you do with all of the communication documents created as part of this high-priority project that you are serving as the business analyst for?

Options:

A.

The communications management plan will dictate what will happen to the business analysis communications.

B.

All formal communication must be destroyed once the project is completed.

C.

All communications must be archived and will become part of the organizational process assets.

D.

All communications must be documented and passed onto the solution's project manager for analysis and to serve as supporting detail.

Buy Now
Questions 139

A business analyst (BA) is working to identity the business need, specifically the problems with the current state of a process. At which level of the enterprise can the BA identify problems with the current state?

Options:

A.

Bottom-up

B.

Top-down

C.

From external drivers

D.

From middle-management

Buy Now
Questions 140

The business analyst (BA) has scheduled an informal review of audit requirements with the compliance officer. The BA wants to demonstrate that the requirements collectively support one another so begins with reviewing the:

Options:

A.

template architectures.

B.

business rules document.

C.

functional specification.

D.

work breakdown structure.

Buy Now
Questions 141

A business analyst (BA) must model information characteristics across multiple information systems for a project. What type of model captures this information?

Options:

A.

Interface analysis

B.

Business capability analysis

C.

Decision analysis

D.

Force field analysis

Buy Now
Questions 142

A company is embarking on a software project in a heavily regulated domain. The client expects large upfront planning and detailed documentation for the project. The recommended approach for the project will be:

Options:

A.

adaptive.

B.

predictive.

C.

waterfall.

D.

scrum.

Buy Now
Questions 143

A lead business analyst (BA) analyzed the performance of all BA's within the organization. How should the BA approach communicating the results to stakeholders?

Options:

A.

Compare a solution used at another company

B.

Identify the performance objectives

C.

Select performance measures

D.

Determine the reporting requirements

Buy Now
Questions 144

A business analyst (BA) is verifying requirements for a software solution. The BA needs to confirm that items determined to be important are included in the final requirements deliverable. Which of the following will help the BA complete this task?

Options:

A.

Checklists

B.

Requirements matrix

C.

Evaluation criteria

D.

Prioritization

Buy Now
Questions 145

A business analyst (BA) is working on a project that follows incremental and iterative approaches. The BA and the stakeholders have shortlisted several user stories to be considered in the project scope. Which of the following methods would enable them to arrive at a common understanding on delivering value in the product and ranking the stories?

Options:

A.

Story decomposition

B.

State modelling

C.

Value stream mapping

D.

MoSCoW prioritization

Buy Now
Questions 146

A business analyst (BA) has discovered an old checklist prepared for another initiative, which includes the following characteristics: Complete, Feasible, Unambiguous, Testable. What is the purpose of this checklist?

Options:

A.

To verify requirements

B.

To measure solution performance

C.

To validate requirements

D.

To compare solution options

Buy Now
Questions 147

A business analyst (BA) is structuring requirements to ensure they are cohesive and tell the full story. Which of the following requirements is consistent with a stakeholder's need: “As a Product Manager, I want to review my general insurance sales performance so I track my sales performance against my annual target”?

Options:

A.

“Provide weekly new bank account sales reports on a shared drive.”

B.

“Increase customer retention across the life insurance division”

C.

“Segment insurance sales data between life and general”

D.

“Migrate the insurance web portal to a cloud platform."

Buy Now
Questions 148

A business analyst (BA) is supporting an organization in its product launch. The BA wants to identify assumptions about the benefits resulting from the new product. What does identifying assumptions help the BA manage?

Options:

A.

Priorities

B.

Metrics

C.

Requirements

D.

Risks

Buy Now
Questions 149

A company wants to increase its market share in the industry and its Board has prioritized capabilities that need to be implemented to achieve the goal. The business requirements for the top priority were signed off and the solution design has been completed. Due to technical constraints, it is not feasible to implement all the requirements at the same time. What must the business analyst (BA) do to deal with this situation?

Options:

A.

Redefine the business requirements associated with each implementation

B.

Recommend a reduction in the project scope

C.

Allocate requirements to different releases

D.

Ensure all requirements are traceable using a matrix

Buy Now
Questions 150

A senior business analyst (BA) must review the requirements specification of a junior BA. The senior BA puts together a list of key evaluation criteria to guide the determination of a requirement’s quality. Which of the criteria below is a characteristic of a quality requirement?

Options:

A.

Mapped

B.

Allocated

C.

Atomic

D.

Owned

Buy Now
Questions 151

A business analyst (BA) has recently joined a large consultancy firm where BAs are globally distributed on different assignments. Where would the BA find expectations for business analysis work as mandated by the consultancy firm?

Options:

A.

Business analysis approach

B.

Organizational performance standards

C.

Modeling notations standards

D.

Information management approach

Buy Now
Questions 152

A business analyst (BA) is examining the relationships between elicited requirements on a project. What quality criteria must be satisfied when the BA is defining requirements relationships?

Options:

A.

Source

B.

Complexity

C.

Necessary

D.

Priority

Buy Now
Questions 153

Project work is taking place to evaluate whether a system's requirements can be met via creating internally, purchasing from others, or a combination of the two. What goal is addressed by this analysis?

Options:

A.

Developing the project plan

B.

Validating the requirements

C.

Outlining the change control strategy

D.

Defining the solution approach

Buy Now
Questions 154

A business analyst (BA) has spent the week conducting work sessions with key stakeholders. Together, they have been reviewing user requirements and high-level design flowcharts to ensure that they have been correctly defined and documented. Which of the following describes the purpose of their work?

Options:

A.

Verifying requirements

B.

Eliciting requirements

C.

Approving requirements

D.

Validating requirements

Buy Now
Questions 155

A business owner has identified a high-priority requirement that needs to be implemented immediately. The project manager has asked the business analyst (BA) to conduct an impact analysis of this change. Which factor will the BA need to consider?

Options:

A.

Selection of the elicitation techniques for the requirement.

B.

Number of systems being affected by the requirement.

C.

Original source of the requirement.

D.

Method of requirement communication.

Buy Now
Questions 156

A business analyst (BA) is logging end-user concerns and resolving these on a priority basis as mandated by the government. This project is a simple application, with no major strategic or financial impact on the organization. The BA strongly enforced end-to-end requirement traceability for this project. Why would the BA recommend this traceability approach?

Options:

A.

Complexity of the domain

B.

Organizational standards

C.

Costs and benefits

D.

Regulatory requirements

Buy Now
Questions 157

Stakeholders must be able to determine the audit and approval history of requirements and designs. Which of the following provides a means to document traceability and change?

Options:

A.

Risk analysis and management

B.

Acceptance and evaluation criteria

C.

Requirements management tools

D.

Legal and regulatory information

Buy Now
Questions 158

A business analyst (BA) conducted a requirements elicitation session with project stakeholders and communicated the results. The project sponsor expressed concern with certain requirements that address the federal government legislation. What must the BA do to address the concern of the project sponsor?

Options:

A.

Ensure requirements are traceable up to user acceptance testing.

B.

Reassure the project sponsor that testing will be conducted diligently.

C.

Determine the communication plan for requirements.

D.

Compare requirements with compliance requirements.

Buy Now
Questions 159

A project is being initiated to create new financial reports for the accounting department, and the accountants have a wide range of views as to what would serve them best. What should the business analyst (BA) do to develop the correct set of requirements?

Options:

A.

Resolve differences of opinion

B.

Conduct an impact analysis

C.

Estimate the scope of work

D.

Perform a feasibility study

Buy Now
Questions 160

A business analyst (BA) held a formal walkthrough of requirements developed on a project. Stakeholders expressed concerns because they had different interpretations of the requirements. What activity would help ensure a common understanding?

Options:

A.

Ensure compliance with key performance indicators

B.

Ensure consistent referencing of requirements

C.

Ensure correct terminology is used

D.

Ensure appropriate templates are used throughout elicitation

Buy Now
Questions 161

A business analyst (BA) is working on a data-centric IT project. The business stakeholders develop the content but do not understand the technical aspects, while the IT team believes that there is no need to understand the business issues. Which deliverable will facilitate understanding between IT and the business stakeholders?

Options:

A.

Transition requirements

B.

Data models

C.

Data dictionary

D.

Non-functional requirements

Buy Now
Questions 162

A business analyst (BA) has just started a large project and is collaborating with stakeholders to define requirements. Another BA is joining soon to help with this initiative. What action should the BA take to ensure that the new BA understands the project?

Options:

A.

Run elicitation sessions in parallel to speed up the process.

B.

Delay elicitation activities until the new BA joins.

C.

Document outcomes of discussions with stakeholders.

D.

Ask the BA to define the stakeholder engagement approach.

Buy Now
Questions 163

A project manager asks a business analyst (BA) to conduct a meeting to walk the stakeholders through how requirements are structured. Which of the following requirement viewpoints will help the BA provide that information?

Options:

A.

Business capability analysis

B.

Data streams

C.

Business process model

D.

State model

Buy Now
Questions 164

A business analyst (BA) has completed multiple workshops involving a number of stakeholders, including the project manager; however, the elicitation results are inconsistent between the stakeholders. How should the variation in results be resolved?

Options:

A.

The BA should model the elicited requirements in a review meeting.

B.

The project manager should decide which requirement is relevant.

C.

The project manager should model the elicited requirements in a review meeting.

D.

The BA should select which requirements are correct.

Buy Now
Questions 165

Which one of the following statements best describes a business analysis methodology?

Options:

A.

It is the conformance to requirements and a fitness for use.

B.

It is a formalized and repeatable business analysis approach.

C.

It specifies team roles, deliverables, analysis techniques, and the timing and frequency of stakeholder interactions.

D.

It is a complete set of action, processes, and output to collect, analyze, and prioritize the project requirements.

Buy Now
Questions 166

As part of a strategic initiative, a bank decides to expand operations to a new country where the most commonly used language is Spanish. The bank's current mobile application only supports English. The organization initiates a project to provide local language support for the app. From which level did the business need originate?

Options:

A.

Middle management

B.

External drivers

C.

Bottom up

D.

Top down

Buy Now
Questions 167

A long-established company selling ice cream is entering its crucial sales period leading up to summer. Based on the company's risk tolerance, a business analyst (BA) has advised against replacing the most popular flavors with new untested flavors. What is the company's attitude toward risk, as assessed by the BA?

Options:

A.

Risk-neutral

B.

Risk-optimizing

C.

Risk-averse

D.

Risk-soaking

Buy Now
Questions 168

A business analyst (BA) has set up a number of elicitation workshops with key subject matter experts (SMEs) on a new project. All SMEs have accepted the workshop invitations except for the legal SME who has not responded to any invitations. The first workshop is scheduled for next week and the BA has tried unsuccessfully to reach the legal SME by phone. How should the BA proceed?

Options:

A.

Re-check the legal SMEs schedule and re-arrange all of the workshops based on vacancies in his or her public calendar

B.

Drop by the legal SMEs desk and have an informed chat about how important his or her involvement and input is on the project

C.

proceed with the first workshop and capture the non-response as a project issue for the project manager to address

D.

Escalate the non-response to the legal SMEs manager via email and request that they make the legal SME attend

Buy Now
Questions 169

A business analyst (BA) is working on an effort to upgrade a system to take advantage of new technology. Most of the end users with the business knowledge and IT staff with technical knowledge of the system are no longer with the company. What can the BA evaluate to better understand the extent of the effort?

Options:

A.

Benefits of upgrading the system

B.

Communication platform to be used

C.

Number of business areas impacted

D.

Collection of performance measures

Buy Now
Questions 170

Stakeholder requirements were approved for a business process reengineering initiative along with the creation of a roadmap.

Due to market conditions, the product roadmap is modified to move the default process to the next iteration. What should the business analyst (BA) modify in the stakeholder requirements?

    Requirement attribute values

    Requirement description

    Requirement performance measures

Options:

A.

Scope model

Buy Now
Questions 171

An organization has identified a market opportunity that could result in significant business gains. A business analyst (BA) is asked to assist in building the new business model. The BA begins by analyzing the current state. What input is critical to the current state analysis?

Options:

A.

Goals and objectives

B.

Organizational culture

C.

Risks and assumptions

D.

Business needs

Buy Now
Questions 172

A finance manager wants to begin a new project to replace the existing expenses processing system. The finance manager feels that the current expense submission-to-reimbursement process takes too long and is substantiated by 50% more complaints regarding incorrect reimbursement amounts than the same time last year. What should the business analyst (BA) investigate first?

Options:

A.

Submission processes to determine which activities can be fully automated

B.

Business process to uncover inefficiencies and falling control points

C.

Enterprise information model to ensure definitions are still valid

D.

Finance solution vendors for inclusion in a Request for information

Buy Now
Questions 173

A business analyst (BA) decided to capture requirements by inviting all the stakeholders to meet at an office location. After invitations were sent, it turned out that not everyone could attend this meeting because of their individual dispersed locations.

Which of the following does the BA need to adjust to handle this situation?

Options:

A.

Project stakeholders

B.

Logistics setup

C.

Elicitation scope

D.

Elicitation technique

Buy Now
Questions 174

A change to support a regulatory requirement is proposed for inclusion in the scope of a project. A business analyst (BA) conducts an impact analysis to determine the extent of the change. What previous task could assist the BA in performing the impact analysis?

Options:

A.

Update use case scenarios

B.

Perform a risk analysis

C.

Create requirement relationships

D.

Conduct a cost-benefit analysis

Buy Now
Questions 175

A business analyst (BA) has developed requirements for a project containing sensitive information. The requirements were approved and the solution was implemented. What should the BA do to ensure these requirements are maintained for future reference?

Options:

A.

Print the requirements package and distribute it to stakeholders in person

B.

Archive the requirements package in the business analysis portal

C.

Store the requirements package on secure shared drive

D.

Send the requirements package to stakeholder in a password protected email

Buy Now
Questions 176

The human resources department of an organization needs a new report. The business analyst (BA) assigned to this effort has scheduled a requirements workshop with the users. Users from the legal department have also been invited to the workshop. As the BA sets up the workshop, what can be done in advance to ensure a productive and focused workshop?

Options:

A.

Document the feedback

B.

Facilitate the workshop

C.

Create an agenda

D.

Reserve a location

Buy Now
Questions 177

The product backlog refinement meeting for a project is complete but two stakeholders do not agree on the priority of several product backlog items. What should the business analyst (BA) do to help move the project forward?

Options:

A.

Schedule a backlog walkthrough with the two stakeholders

B.

Confirm the authority of the two stakeholders

C.

Notify the project manager

D.

Apply the previous backlog priority

Buy Now
Questions 178

A business analyst (BA) is working on a data-centric IT project. The business stakeholders develop the content but do not understand the technical aspects while the IT team believes that there is no need to understand the business issues. Which deliverable will facilitate understanding between IT and the business stakeholders?

Options:

A.

Data models

B.

Data dictionary

C.

Transition requirements

D.

Non-functional requirements

Buy Now
Questions 179

The project manager has tasked the business analyst (BA) to collect a performance measure on the solution implemented in the latest release. Which of the following considerations can help the BA obtain that information?

Options:

A.

Sample size

B.

Solution size

C.

Performance variance

D.

Risk assessment

Buy Now
Questions 180

A recent survey shows that a newly implemented system has features that the users have never used. Upon reviewing the survey report, the Chief Executive Officer (CEO) highlighted that the company must avoid future implementations with functionality that does not provide any business value. What must the business analyst (BA) do to ensure future requirements meet a business need?

Options:

A.

Consider business relevance while tracing requirements

B.

Choose appropriate format to communicate requirements

C.

Ensure test scenarios align to business requirements

D.

Facilitate a focus group with users to get feedback

Buy Now
Questions 181

A business analyst (BA) is logging the end user concerns and resolves these on a priority basis as mandated by the government. This project is a simple application, with no major strategic or financial impact to the organization. The BA strongly enforced end-to-end requirement traceability for this project. Why would the BA recommend this traceability approach?

Options:

A.

Regulatory requirements

B.

Costs and benefits

C.

Organizational standards

D.

Complexity of the domain

Buy Now
Questions 182

A business analyst (BA) elicits requirements from end users for a new application, and then completes a set of use cases and use case scenarios. What should the BA do next?

Options:

A.

Identify all the roles and responsibilities

B.

Review the use case scenarios

C.

Conduct a requirements workshop

D.

Create acceptance and evaluation

Buy Now
Questions 183

A lead business analyst (BA) has received negative feedback on the deliverables produced by BAs in the organization. A major concern was ambiguous requirements. What technique will help ensure business analysis information is clear and understandable?

Options:

A.

Choose appropriate format to communicate requirements

B.

Align test scenarios with business needs

C.

Ensure all requirements are testable

D.

Use checklists for quality control

Buy Now
Questions 184

A business analyst (BA) asked two stakeholders with approval authority to approve the requirements. The stakeholders are being asked to confirm that:

Options:

A.

organizational value will be created from the investment.

B.

all questions have been answered.

C.

project priorities are agreed upon.

D.

relevant legal and regulatory needs are met.

Buy Now
Questions 185

A business analyst (BA) is negotiating and resolving conflict with stakeholders to ensure they participate in the required BA activities. Which element of stakeholder management is the BA performing?

Options:

A.

Confirm elicitation results

B.

Gain agreement on commitments

C.

Monitor stakeholder engagement

D.

Plan stakeholder engagement

Buy Now
Questions 186

A stakeholder has requested an extremely detailed resolution to an issue during current state analysis that may consume about 20% of the estimated project effort. How should the business analyst (BA) handle the situation?

Options:

A.

Ask the project sponsor for additional funding

B.

Escalate the request to the project manager for reevaluation of the plan

C.

Spend the required effort to develop the detail

D.

Explain that the degree of effort may not be necessary at this stage

Buy Now
Questions 187

A business analyst (BA) spent three months eliciting, specifying, and modelling the detailed stakeholder and solution requirements. Right before requirement sign-off, the BA realized that the Vice President was unable to approve the requirements and the Chief Financial Officer should do so. What element of requirement approval did the BA miss?

Options:

A.

Manage conflicts and issues

B.

Track and communicate approval

C.

Gain consensus

D.

Understand stakeholder roles

Buy Now
Questions 188

Project work is taking place to evaluate whether a system's requirements can be met via creating internally, purchasing from others, or a combination of the two. What goal is addressed by this analysis?

Options:

A.

Developing the project plan

B.

Outlining the change control strategy

C.

Defining the solution approach

D.

Validating the requirements

Buy Now
Questions 189

Which one of the following is not an event-based elicitation technique?

Options:

A.

Focus group

B.

Interface analysis

C.

Interview

D.

Workshop

Buy Now
Questions 190

You are the business analyst for your organization and working with the stakeholders to prioritize the requirements. The stakeholders are concerned about the financial impact of the requirements should some of them fail during the implementation. You would like to rank the risk tolerance of the stakeholders based on their comments about the solution and the requirements. The following are the three categories of risk tolerance associated with the stakeholders except for which one?

Options:

A.

Neutrality

B.

Mitigation

C.

Risk-seeking

D.

Risk-aversion

Buy Now
Questions 191

As a business analyst, you may be called upon to define the scope of work and to develop the estimates for the endeavor. Which one of the following is an important tool for this activity?

Options:

A.

Organizational process asset

B.

WBS

C.

Project management plan

D.

Pareto chart

Buy Now
Exam Code: CCBA
Exam Name: Certification of Capability in Business Analysis (CCBA)
Last Update: Mar 28, 2025
Questions: 638

PDF + Testing Engine

$57.75  $164.99

Testing Engine

$43.75  $124.99
buy now CCBA testing engine

PDF (Q&A)

$36.75  $104.99
buy now CCBA pdf