New Year Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: pass65

CTS Certified Technology Specialist Questions and Answers

Questions 4

What does a compressor control in an audio system?

Options:

A.

phase

B.

directivity

C.

frequency

D.

dynamic range

Buy Now
Questions 5

Which addressing scheme is used to define a fixed, routable IPv4 address that is locally assigned?

Options:

A.

static

B.

DHCP

C.

link-local

D.

DHCP reservation

Buy Now
Questions 6

The installation of a complex AV project is planned to be completed within 6 months. What is the MOST cost-effective plan for ordering the equipment for the project?

Options:

A.

Order everything as soon as the contract is signed.

B.

Place the order 5 days before the scheduled day for starting installation.

C.

Order each piece of equipment to be delivered as soon as possible.

D.

Order equipment to be delivered on a "just in time" basis according to the installation schedule.

Buy Now
Questions 7

Which microphone type has a basic cardioid pick up pattern?

CTS Question 7

Options:

A.

Type(a)

B.

Type(b)

C.

Type(c)

D.

Type(d)

Buy Now
Questions 8

Remotely monitoring system health of a deployed conference room and rebooting it when faulty is an example of

Options:

A.

a service call.

B.

troubleshooting.

C.

a service contract.

D.

proactive maintenance.

Buy Now
Questions 9

The amount of light emitted through a projection system lens is TYPICALLY specified and measured

Options:

A.

in lux.

B.

in lumens.

C.

in footcandles.

D.

by its contrast ratio.

Buy Now
Questions 10

As part of a service agreement offering, wfwt PRIMARY role do preventive maintenance visits (PM/PMV) play?

Options:

A.

allows the AV provider toclean, service and assess equipment In the field on a regular basis

B.

allows the AV provider to check in with customer and serves as an opportunity to sell further solutions

C.

allows the AV provider tosell a service that is often forgotten by the customer, and therefore generate greater profit

D.

allows the AV provider access to client premises and scope future work

Buy Now
Questions 11

Owner standards and design manuals are examples of which kind of documentation?

Options:

A.

vendor

B.

technical

C.

architectural

D.

existing conditions

Buy Now
Questions 12

During a site survey, a client states that there will be no acoustical treatment to their new council chamber and they want a voice lifting (reinforcement) system. Which loudspeaker should be recommended to achieve optimal speech intelligibility?

Options:

A.

coaxial loudspeaker

B.

broad beam loudspeaker

C.

narrow beam loudspeaker

D.

ceiling mount loudspeaker

Buy Now
Questions 13

The best practice for tagging AV equipment for inventory management is to

Options:

A.

only tag Items over $99.00 in value.

B.

use a unique identifier for each item.

C.

include the value of each item on the tag.

D.

label all Items of the same model with a common identifier.

Buy Now
Questions 14

Referring to this mix-minus system, in which zone should zone C's microphones be the LOUDEST? Select the answer by clicking anywhere within the correct zone.

CTS Question 14

Options:

Buy Now
Questions 15

Which method of control is supported by HDBaseT?

Options:

A.

PCIE

B.

DAU

C.

RS-232

D.

DMX512

Buy Now
Questions 16

Which of the following protocol allows sources and displays to communicate in order to ensure the display is sent the correct signal?

Options:

A.

ATSC

B.

DVB

C.

EDID

D.

HDCP

Buy Now
Questions 17

During a site survey, a sound pressure level (SPL) meter can be used for measuring

Options:

A.

the room acoustics.

B.

the ambient noise level.

C.

the efficiency of the amplification.

D.

distance to existing loudspeakers.

Buy Now
Questions 18

Which is the MOST important factor during the development of an AV project scope?

Options:

A.

entire budget

B.

clients responsibility

C.

analyze the strategic plan

D.

stakeholders requirements

Buy Now
Questions 19

Which section of a program report describes the probable costs of an AV project?

Options:

A.

budget

B.

needs analysis

C.

systems descriptions

D.

infrastructure requirements

Buy Now
Questions 20

Which of the following terms is defined as a lamp that produces light by heating a filament in a sealed glass housing?

Options:

A.

Incandescent Lamp

B.

Fluorescent Lamp

C.

CFL Lamp

D.

LED Lamp

Buy Now
Questions 21

For a design-bid (tender)-build project, the final step for determining the owner's costs for an AV system is

Options:

A.

selecting an Integrator.

B.

performing a needs analysis.

C.

having the owner approve the design.

D.

ensuring the equipment specification is ready for bid.

Buy Now
Questions 22

Which connector is TYPICALLY used for RS232 connections?

Options:

A.

CTS Question 22 Option 1

B.

22

C.

22

D.

22

Buy Now
Questions 23

An integrator has to upgrade a camera system in an existing board room. What is the MOST IMPORTANT information to gather on the site visit?

Options:

A.

cable length

B.

ambient lighting placement

C.

resolution of camera system

D.

distance from the lens to first participant

Buy Now
Questions 24

What is the FIRST stage in troubleshooting an AV system?

Options:

A.

evaluating possible sources of error

B.

identifying the symptoms of the error

C.

determining which devices are fully functional

D.

reviewing the system diagram showing the connections and the signal flow

Buy Now
Questions 25

The MAIN benefit of an inventory tracking system in an AV rental and staging business is having an accurate record of

Options:

A.

customers contact details.

B.

current resale value of assets.

C.

current state and commitments of assets.

D.

customer’s budgets and spending history.

Buy Now
Questions 26

During an initial meeting with a prospective client regarding an audiovisual project, it is important to understand the customer's method of procurement in order to avoid.

Options:

A.

making commitments with regard to delivery times for equipment.

B.

designing the system beyond the budgetary constraints of the client.

C.

missing some of the important components that will be included in the final project.

D.

expending time and resources designing a project that may ultimately go to bid (tender).

Buy Now
Questions 27

Invoicing clients, purchasing AV equipment and providing estimates are examples of which of the following types of work?

Options:

A.

design

B.

installation

C.

administration

D.

project management

Buy Now
Questions 28

CTS Question 28

Two computers are connected to a videoconferencing system through a switcher using HDMI cables. Computer content from PC A is being properly transmitted. However, when PC B is selected by the switcher, it does not work through the videoconferencing system. They both work when connected directly to the videoconferencing system or the monitor. The solution is to add a device that enables____management.

Options:

A.

DDC

B.

DHCP

C.

HDCP

D.

TMDS

Buy Now
Questions 29

When comparing two products and trying to decide which product to use, what is the FIRST thing that should be reviewed?

Options:

A.

price

B.

product reliability

C.

equipment lead times

D.

product specifications

Buy Now
Questions 30

When considering the security of AV equipment residing on the client network, what is the MOST important step to take to keep the equipment safe from hackers before connecting the equipment to the network?

Options:

A.

assign an isolated subnet

B.

change the default passwords

C.

lock out the front panel buttons

D.

mount the equipment to the rack with security screws

Buy Now
Questions 31

A cardioid subwoofer array uses delay, equalization, and

Options:

A.

gating.

B.

polarity.

C.

phase shift.

D.

compression.

Buy Now
Questions 32

What PRIMARY concern should the sales representative have had during the site survey of this room?

CTS Question 32

Options:

A.

room orientation

B.

length of cable runs

C.

ceiling clearance for the projector lift

D.

combination of fluorescent and Incandescent lighting

Buy Now
Questions 33

What is the BEST way to manage a campus-wide AV system deployment?

Options:

A.

service level agreement

B.

on-site monitoring checks

C.

remote monitoring solution

D.

stand-by stock of equipment

Buy Now
Questions 34

What frequency is identified by the numbers above each slider of a graphic equalizer?

CTS Question 34

Options:

A.

center

B.

lowest

C.

highest

D.

secondary

Buy Now
Questions 35

When an audio device can no longer accurately reproduce the audio signal, It is called

Options:

A.

feedback.

B.

dithering.

C.

distortion.

D.

saturation.

Buy Now
Questions 36

While troubleshooting a DSP, the AV technician notices that the DHCP server has failed due to the control system not being able to control the volume of the DSP. In order to restore the same IP, the control programmer requires a unique identifier assigned to the network interface card of the DSP. What is the name of that address?

Options:

A.

media access control

B.

internet protocol address

C.

network address translation

D.

digital multiplex exchange address

Buy Now
Questions 37

What is the MAIN difference between OLED displays and LED displays?

Options:

A.

luminosity

B.

higher brightness

C.

self-emitting light source

D.

determined screen shape

Buy Now
Questions 38

What is the document that shows project tasks, indicating their allocated time, dependencies, and relationships between activities?

Options:

A.

flow chart

B.

Gantt chart

C.

needs analysis

D.

Venn diagram

Buy Now
Questions 39

"Shock Loads" for equipment mounts refer to

Options:

A.

suspended equipment not electrically isolated from Its mounting structure.

B.

sudden additional loads from earthquakes or personnel hanging from the mounts.

C.

calculated counterweight required to balance an offset load on a cantilever mount.

D.

calculated isolation required to eliminate vibration otherwise transferred to the building structure.

Buy Now
Questions 40

What would be the BEST way to verify proper performance of a CAT cable fitted with a new termination?

Options:

A.

use a cable tester and run a protocol

B.

use a multimeter to test if the pins have a connection

C.

connect the cable to a reference unit to check against it

D.

connect the source and sync, then verify there is a picture

Buy Now
Questions 41

An application requires Its equipment to be operational 24 hours a day and the owner considers the system mission critical. What type of warranty would be BEST for the equipment?

Options:

A.

limited warranty

B.

implied warranty

C.

manufacturer's factory warranty

D.

advanced replacement warranty

Buy Now
Questions 42

Which of the following is an EQ type?

Options:

A.

gate

B.

limiter

C.

parametric

D.

compressor

Buy Now
Questions 43

Reverberant sound reaches the listener's ears

Options:

A.

after

B.

before

C.

synchronized with

D at the same level as the direct sound.

Buy Now
Questions 44

Which document is used to clarify a project design issue?

Options:

A.

change order

B.

progress report

C.

request for change

D.

request for Information

Buy Now
Questions 45

What is the name for a written, non-technical narrative that explains system functionality?

Options:

A.

needs analysis

B.

program report

C.

service manual

D.

performance verification

Buy Now
Questions 46

Which section of the Ohm's Law chart would you use to calculate watts? Select the coned quadrant.

CTS Question 46

Options:

Buy Now
Questions 47

Which of the following terms means a complete lighting instrument composed of a lamp and housing?

Options:

A.

lux

B.

lumen

C.

luminaire

D.

footcandle

Buy Now
Questions 48

What should be used to clean foam microphone wind screens?

Options:

A.

bleach (lye)

B.

warm water

C.

ethyl alcohol

D.

isopropyl alcohol

Buy Now
Questions 49

When connecting two switches with multiple VLANs, which function should be setup in order to pass all the packets from one switch to the other?

Options:

A.

trunk line

B.

multicast routing

C.

QoS (Quality of Service)

D.

SFP (Small Form-factorPluggable)

Buy Now
Questions 50

A schedule is being created for a project. Which of these factors will have the MOST impact on the calculations?

Options:

A.

labor hours

B.

inventory

C.

blueprints

D.

cost of materials

Buy Now
Questions 51

In order to mount a projector so that it is horizontally centered with the suspended screen, the technician should look at which drawings in the plans?

Options:

A.

detail

B.

sections

C.

elevations

D.

reflected ceiling

Buy Now
Questions 52

A client has a room that can be used as one large room or three separate rooms. Each room has several different audio and video options. What type of system should be suggested to the client for ease of use?

Options:

A.

switching

B.

control

C.

sound

D.

lighting

Buy Now
Questions 53

When planning video content with a client, it is important to get their Pantone data (PMS) to ensure

Options:

A.

the displayed colors match printed colors.

B.

their confidence monitor size is large enough.

C.

the displayed logo is the proper size and style.

D.

the displayed type face is the correct size and style.

Buy Now
Questions 54

Noting the position of ventilation ducts is useful when determining

Options:

A.

the best position for the lectern.

B.

the heat gain of the equipment rack.

C.

where a projector can be suspended.

D.

where people can be seated in the room.

Buy Now
Questions 55

Which of the following project management activities coordinates project requirements and resources?

Options:

A.

project budget

B.

logic model timeline

C.

logic network diagram

D.

project kick-off meeting

Buy Now
Questions 56

The AV Project Manager is responsible for

Options:

A.

schedule, budget, scope.

B.

design, schedule, configuration.

C.

budget, installation, maintenance.

D.

configuration, scope, maintenance.

Buy Now
Questions 57

A client wants to upgrade tire AV system in a boardroom and add control of the lights and shades to the control panel. What information is MOST relevant to gather to enable this integration?

Options:

A.

color temperature

B.

number of IR ports

C.

warranty Information

D.

communications protocols

Buy Now
Exam Code: CTS
Exam Name: Certified Technology Specialist
Last Update: Dec 14, 2024
Questions: 193

PDF + Testing Engine

$57.75  $164.99

Testing Engine

$43.75  $124.99
buy now CTS testing engine

PDF (Q&A)

$36.75  $104.99
buy now CTS pdf