DES-6322 Specialist - Implementation Engineer-VxRail Exam Questions and Answers

Questions 4

An implementation engineer is deploying a new VxRail cluster. What should they confirm before installing the hardware?

Options:

A.

Service laptop must be on the same IP network as the iDRACs

B.

At least 36 in (92 cm) clearance exists in front of and behind the cabinet

C.

Power distribution must support the power rating of a single node

D.

Single power zone must be used with adequate power cables

Buy Now
Questions 5

A systems engineer needs to check the health of the nodes and the system VMs to prevent complications or failures during VxRail upgrades. Which tool must be used to perform the task?

Options:

A.

VxVerify

B.

CloudlQ

C.

SolVe Online

D.

VxRail ACE

Buy Now
Questions 6

A systems engineer is deploying a VxRail cluster. They want to ensure that configuration issues can be avoided when expanding this cluster.

Which actions need to be performed?

Options:

A.

Verify VxRail nodes are racked and connected to the ToR switches

Validate the network environment

B.

Validate that no pending and unfinished jobs are running on the servers

Verify that the server and storage components are working properly

C.

Validate that the latest updates and patches are installed in the system

Validate that no pending and unfinished jobs are running on the servers

D.

Verify the configuration settings initially captured in PEQ

Validate the storage environment

Buy Now
Questions 7

Which two files are used to automate VxRail deployment and validate the network configuration?

Options:

A.

Appliance JSON file

PEQ data file

B.

VxRail Configuration Portal

PEQ data file

C.

VxRail Test Plan

SPEQ

D.

Appliance JSON file

SPEQ

Buy Now
Questions 8

What is a consideration when adding nodes to a VxRail G Series chassis?

Options:

A.

G560 and G410 nodes are permitted in the same chassis

B.

In a full G Series chassis, all nodes must have 10GbE ports

C.

Hybrid and All-Flash nodes are permitted, if in different chassis

D.

All nodes in a G Series chassis must be identical

Buy Now
Questions 9

What is the minimum number of VxRail nodes required for a vSAN storage policy with RAID-5 (Erasure Coding)?

Options:

A.

3

B.

4

C.

5

D.

6

Buy Now
Questions 10

An implementation engineer is performing a precheck on a VxRail cluster before expansion. During validation, they find out that the host is not compatible.

Use the VxRail simulator to describe why the host is Incompatible.

Note: It is necessary to close (x) the simulator window before you can select a response to this question.

DES-6322 Question 10

DES-6322 Question 10

DES-6322 Question 10

DES-6322 Question 10

DES-6322 Question 10

DES-6322 Question 10

Options:

A.

bmc and bios are running older versions

B.

Insufficient number of vSphere licenses

C.

Firmware of ESXi host needs to be updated

D.

Invalid vCenter 5erver license

Buy Now
Questions 11

What is the basis used for VMware vSAN licensing?

Options:

A.

TB capacity per node

B.

TB capacity per cluster

C.

Per disk group

D.

Per CPU socket

Buy Now
Questions 12

What is a valid 2-node VxRail cluster configuration?

Options:

A.

Series with 4x 25 GbE in a direct-connect configuration

B.

Series with 4x 10 GbE in a switch configuration

C.

Series with 4x 1 GbE in a direct-connect configuration

D.

Series with 2x 25 GbE in a switch configuration

Buy Now
Questions 13

During the activation of Internal SRS, the implementation engineer receives a message that the deployment has failed What is a possible cause?

Options:

A.

SRS VE Gateway on the same subnet as the VxRail Manager

B.

VxRail status already set to installed' in IB database

C.

Site ID mismatch between the IB database and the SRS Wizard

D.

Witness Gateway not configured following Dell best practices

Buy Now
Questions 14

What is a consideration when performing a VxRail software upgrade from version 4.7.xxx to version 7.0.xxx?

Options:

A.

External vCenter server must be upgraded after the VxRail is upgraded

B.

vCenter Server requires a temporary IP address on a different subnet before the upgrade

C.

Secure boot must be enabled on the ESXi hosts for a successful upgrade

D.

VxRail Manager VM must be changed to the default name to avoid an upgrade failure

Buy Now
Questions 15

An infrastructure system audit will begin in two weeks All data center devices will be checked to ensure they contain the installed patches and configurations. A system engineer will update the VxRail hosts with the latest patches and remediate security vulnerabilities.

What troubleshooting resource can a user receive from Dell and use proactively to help perform the remediation tasks?

Options:

A.

KB articles

B.

SolVe Online

C.

Log files

D.

Advisories

Buy Now
Exam Code: DES-6322
Exam Name: Specialist - Implementation Engineer-VxRail Exam
Last Update: Dec 19, 2024
Questions: 105

PDF + Testing Engine

$57.75  $164.99

Testing Engine

$43.75  $124.99
buy now DES-6322 testing engine

PDF (Q&A)

$36.75  $104.99
buy now DES-6322 pdf