IDPX Interior Design Professional Exam Questions and Answers

Questions 4

A client wants to convert a 10,000 sf [929 m²] retail facility into an office space. What is the MOST important activity to do as a part of programming?

Options:

A.

Identify building codes

B.

Prepare record (as-built) drawings

C.

Calculate the number of parking spaces

D.

Determine which consultants are required

Buy Now
Questions 5

Which party is responsible for requesting inspections during construction of a project?

Options:

A.

owner

B.

designer

C.

sub-contractor

D.

general contractor

Buy Now
Questions 6

A lien has been placed on a building. What may be a probable cause for this action?

Options:

A.

A subcontractor has not been paid by the general contractor

B.

The certificate of substantial completion has not been issued

C.

The client requires more financing

D.

Contract documents do not comply with building code

Buy Now
Questions 7

Gross leasable area is measured from the

Options:

A.

centerlines of shared partitions to the inside of tenant walls

B.

centerlines of shared partitions to the outside of tenant walls

C.

inside surface of shared partitions to the inside of tenant walls

D.

inside surface of shared partitions to the outside of tenant walls

Buy Now
Questions 8

What is the PRIMARY reason to maintain a master submittal log on a project?

Options:

A.

Confirm adherence to the contract

B.

Document the installation schedule

C.

Verify compliance with specifications

D.

Facilitate distribution and timely review

Buy Now
Questions 9

What deliverables are the responsibility of the interior designer in the design development phase?

Options:

A.

Power and data plans, floor plans with partition types

B.

Floor plans, reflected ceiling plans with HVAC ductwork layout

C.

Reflected ceiling plans with fixture types, floor plans with partition types

D.

Power and data plans, reflected ceiling plans with sprinkler head locations

Buy Now
Questions 10

Formaldehyde, PVC, and phthalates are examples of chemicals included in

Options:

A.

The Red List

B.

Class C finishes

C.

Hazardous building types

D.

CAL 133 compliant products

Buy Now
Questions 11

Any space that is classified as an assembly occupancy MUST have

Options:

A.

the occupancy load posted

B.

a dedicated restroom (washroom)

C.

direct access to the main elevator

Buy Now
Questions 12

Earthquakes and the loads caused by winds are examples of

Options:

A.

Live loads

B.

Dead loads

C.

Static loads

D.

Dynamic loads

Buy Now
Questions 13

Administration, marketing, and management expenses in a design firm are examples of

Options:

A.

Indirect labor

B.

Billable hours

C.

Direct materials

D.

Facility overhead

Buy Now
Questions 14

Which wall assembly would produce the highest STC rating?

Options:

A.

2x4 studs at 16" [406 mm] OC, 2 layers of 5/8" [15 mm] gypsum board on each side, full batt insulation

B.

2-1/2" [64 mm] metal studs at 16" [406 mm] OC, 1/2" [13 mm] gypsum board on each side, full batt insulation

C.

3-1/2" [89 mm] metal studs at 16" [406 mm] OC, 5/8" [15 mm] gypsum board on each side, full batt insulation

Buy Now
Questions 15

What is the MAXIMUM occupant load of a business occupancy with one exit?

Options:

A.

49

B.

50

C.

69

D.

70

Buy Now
Questions 16

Which of the following factors in daylighting design determines the depth of light penetration into the space?

Options:

A.

window height

B.

shading device

C.

glazing material

D.

reflective surface

Buy Now
Questions 17

Legislation that establishes guidelines of professional responsibilities for an interior designer is known as the

Options:

A.

title act

B.

practice act

C.

registration act

D.

professional act

Buy Now
Questions 18

The purpose of a post-occupancy evaluation is to determine

Options:

A.

Compliance with the punch (deficiency) list

B.

The quality of general contractor performance

C.

The completeness of the construction documents

D.

Client satisfaction or dissatisfaction with the project

Buy Now
Questions 19

Who should be consulted when specifying materials and finishes to ensure maintenance adherence?

Options:

A.

Tenant

B.

Facility manager

C.

General contractor

Buy Now
Questions 20

What core information should be captured in the design contract to demonstrate a clear understanding of the physical parameters of the project?

Options:

A.

Property address, usable square footage [m²], and projected use

B.

Room name, client, and occupant load

C.

Room measurements, drawing references, and furniture requirements

D.

Occupant load, circulation ratio, and building classification

Buy Now
Questions 21

Why is corrective work completed post-occupancy often MORE costly for the contractor?

Options:

A.

The warranty has expired

B.

Progress payments are not included

C.

The work must be performed after hours

D.

Revisions are billed on a cost-plus basis

Buy Now
Questions 22

To reduce radon levels in a home, it is recommended that the

Options:

A.

crawl space is ventilated

B.

building is depressurized

C.

basement windows are sealed

D.

expansion joints are installed at slabs-on-grade

Buy Now
Questions 23

The designer attends the weekly progress meetings and is responsible for the meeting minutes. How does the designer ensure that the minutes prepared are accurate?

Options:

A.

Issue a clause in the minutes indicating that minutes are approved and accepted as written

B.

Issue minutes including a clause stipulating minutes will be approved within 24 hours of issue

C.

Issue minutes including a clause enabling attendees to submit revisions within a specified time frame

D.

Issue draft minutes within 24 hours of the meeting, followed by final minutes within 72 hours of meeting completion

Buy Now
Questions 24

When special equipment is being leased by a tenant from a third-party vendor, who is typically responsible for the equipment installation after occupancy?

Options:

A.

the tenant

B.

the vendor

C.

the contractor

D.

the building owner

Buy Now
Questions 25

The purpose of shop drawings is to

Options:

A.

Analyze the fabrication method

B.

Approve completeness of the details

C.

Check conformance with the design intent

Buy Now
Questions 26

Which of the following is often within a building’s management office with the purpose of locating the building’s smoke detection devices?

Options:

A.

electric panel

B.

annunciator panel

C.

backup power panel

D.

fire alarm manual pull station

Buy Now
Questions 27

In which type of space would occupant load be calculated using net square footage?

Options:

A.

exercise room

B.

airport terminal

C.

museum exhibit

Buy Now
Questions 28

In a project that includes a home renovation and procurement of new furniture, what is the BEST fee structure?

Options:

A.

Hourly fee method and cost-plus method

B.

Square foot method and fixed fee method

C.

Fixed fee method and square foot method

D.

Value-oriented method and hourly fee method

Buy Now
Questions 29

A client has signed a lease for a ground floor space previously used as a mobile phone retail store and plans to convert the space into a medical office. The designer should FIRST

Options:

A.

contact the building department to confirm if this use is permitted

B.

request programming information from the client and generate test fit plans

C.

survey existing space and ensure site conditions match up with CAD background

D.

confirm if the occupancy type above the space will trigger a fire separation requirement

Buy Now
Questions 30

Where allowed by jurisdictional statute, when would an independent interior designer’s seal on drawings be acceptable?

Options:

A.

In combination with an architect’s seal on construction documents

B.

On the life-safety section of the construction documents

C.

In combination with a structural engineer’s seal

D.

On non-structural interior construction documents

Buy Now
Questions 31

Which item causes the MOST issues when planning for systems workstations in an office space?

Options:

A.

The workstation cost is too expensive for the client’s budget

B.

The thickness of the panels was not considered when maintaining clearances

C.

The height of the panels is too low to reduce sound from traveling between workstations

D.

The electrical outlets are not maintained at the correct height to accommodate equipment

Buy Now
Questions 32

In a large project, what is the BEST reason to enter into a joint venture?

Options:

A.

Increase the firm’s profit margins

B.

Maximize hiring of short-term staff

C.

Allocate staff resources to one project

D.

Gain experience in a new type of work

Buy Now
Questions 33

A residential client wants to build an addition that would occupy the entire side-yard. What is the interior designer responsible for checking before proceeding?

Options:

A.

soils report

B.

access route

C.

setback requirement

D.

neighborhood agreement

Buy Now
Questions 34

What is the MINIMUM fire rating for a door in a 2-hour fire separation wall?

Options:

A.

3/4-hour

B.

1-hour

C.

1 1/2-hours

D.

2-hours

Buy Now
Questions 35

What floor finish would BEST support a passive solar design strategy in a hot arid climate?

Options:

A.

vinyl

B.

wood

C.

carpet

D.

concrete

Buy Now
Questions 36

A post-occupancy evaluation indicates that occupants are cold during winter months due to the building’s HVAC system not performing according to design. What would have prevented this situation?

Options:

A.

commissioning

B.

additional diffusers

C.

a punch (deficiency) list

D.

an underfloor distribution system

Buy Now
Questions 37

Which statement about change orders is MOST accurate?

Options:

A.

They are written permissions or instructions that modify construction documents

B.

They are notices to the client advising of changes to the construction documents

C.

They are changes made to the contract documents during the bid (tender) phase

D.

They are written instructions issued by the designer to the subtrades once the initial construction has begun

Buy Now
Questions 38

A restaurant is designated as which occupancy classification?

Options:

A.

public: group P-3

B.

business: group B

C.

restaurant: group R

D.

assembly: group A-2

Buy Now
Questions 39

The interior designer presents budget options based on quality ranges and the client approves a budget on the low end. Throughout the design process, the client has added higher quality items and the project is now over budget. What could have been done to prevent this problem?

Options:

A.

Included a contingency line item in the budget

B.

Required the client to fill out preliminary budget sheets

C.

Reviewed the budget status more frequently with the client

D.

Redefined the specifications based on a square foot budget

Buy Now
Questions 40

A conflict on the job site impacts the location of a wall sconce, requiring an adjustment. The BEST way to communicate this change is for the

Options:

A.

interior designer to request the electrical engineer issue a change order

B.

interior designer to provide a sketch as part of a supplemental instruction

C.

general contractor to request a change directive prior to making a change

D.

electrical engineer to issue an addenda as part of the contract documents

Buy Now
Questions 41

What spaces are typically grouped together in a multistory building’s service core?

Options:

A.

lobby, elevator, corridors, stairs

B.

stairs, elevator, toilet rooms, supply closet

C.

kitchen, toilet rooms, loading docks, laundry

D.

janitors closets, electrical closets, data rooms, HVAC

Buy Now
Questions 42

During construction of a project in another city, what is a common and efficient way for a small firm to manage the progress?

Options:

A.

visit the location of the project on a weekly basis

B.

joint-venture with a design firm local to the project

C.

partner with a prominent company local to the designer

D.

hire one employee that will remain in the city of the project

Buy Now
Questions 43

On a multi-tenant floor, what is the usable area when calculating square footage according to Building Owners and Managers Association (BOMA) standards?

IDPX Question 43

Options:

A.

Tenant 1 and Tenant 2

B.

Tenant 1, Tenant 2, and Elevator Lobby 3

C.

Tenant 1, Tenant 2, and Electrical/Telephone 5

D.

Tenant 1, Tenant 2, Electrical/Telephone 5, and Elevator Lobby 3

Buy Now
Questions 44

A client wants to remove the gypsum board from an existing structural column and leave it exposed. What implications might this have on the fire rating of the assembly?

Options:

A.

Reduce the fire rating of the assembly

B.

Increase the fire rating of the assembly

C.

There would be no change in the fire rating of the assembly

Buy Now
Questions 45

What is the MOST important consideration when specifying light fixtures for a retail store?

Options:

A.

Wattage

B.

Indirect glare

C.

Reflected glare

D.

Color rendering index

Buy Now
Questions 46

What should a designer recommend to BEST save on construction costs in a corporate office project with a tight improvement allowance?

Options:

A.

Reuse the existing doors and millwork where possible

B.

Save as many existing nonstructural walls as possible

C.

Maintain the existing water closet and lavatory locations

D.

Design an open-plan for each space without suspended ceilings

Buy Now
Questions 47

What provision should a designer include in the contract to minimize liability in claims that arise from delays caused by other project members?

Options:

A.

An exclusion of liability for delays caused by other project members

B.

A realistic project schedule with deadlines for each phase of the project

C.

A specified number of months the contract is in force, with a renewal clause

D.

Language excluding the designer from delay-related errors and omissions liability

Buy Now
Questions 48

Design time has exceeded what was estimated when determining the fixed-fee contract. Whatshould be done?

Options:

A.

Proceed with fees designated in the contract

B.

Negotiate a new contract and fee agreement

C.

Stop work until a new agreement can be negotiated

D.

Attach time sheets to the invoice to clarify additional fees

Buy Now
Questions 49

Changes made to the contract documents during the bid (tender) process are documented in a(n)

Options:

A.

Bulletin

B.

Addendum

C.

Change order

Buy Now
Questions 50

What is the MINIMUM aisle width in retail areas conforming to universal accessibility standards?

Options:

A.

32" [813 mm]

B.

36" [914 mm]

C.

42" [1067 mm]

D.

48" [1219 mm]

Buy Now
Questions 51

Which of the following is MOST likely to require a louvered door?

Options:

A.

IT closet

B.

Hotel room

C.

Executive office

D.

Dental exam room

Buy Now
Questions 52

Permit application requirements are developed by the

Options:

A.

local jurisdiction of the project

B.

International Code Council (ICC)

C.

general contractor for the project

D.

National Fire Protection Association (NFPA)

Buy Now
Exam Code: IDPX
Exam Name: Interior Design Professional Exam
Last Update: Apr 4, 2025
Questions: 175

PDF + Testing Engine

$57.75  $164.99

Testing Engine

$43.75  $124.99
buy now IDPX testing engine

PDF (Q&A)

$36.75  $104.99
buy now IDPX pdf