Black Friday Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: pass65

WELL-AP WELL Accredited Professional (WELL AP) Exam Questions and Answers

Questions 4

A company is moving is 1, 500 employees into a new office building, which has lust passed documentation review. The building contractor has handed over the project. And the certificate of occupancy was granted two months ago Currently, 650 employees occupy the building. Which of the following steps should the WELL AP advise the project team to take next?

Options:

A.

Perform a post occupancy survey

B.

Conduct an internal performance verification

C.

Wait until 50% occupancy for performance verification

D.

Proceed with performance verification at 45% occupancy

Buy Now
Questions 5

Supplemental light fixtures are provided to occupants upon request at no cost within a WELL building. This benefit will enhance occupant comfort by

Options:

A.

providing visual diversity

B.

improving correlated color temperature

C.

keeping lighting uniformity in the space

D.

increasing the light level on the task surface

Buy Now
Questions 6

What is the value of performance verification in the certification process?

Options:

A.

To simplify the documentation process

B.

To validate the calibration of monitors and sensors

C.

To ensure that the building is performing as designed

D.

To verify high quality of workmanship by the contractor

Buy Now
Questions 7

Which of the following is an important consideration addressed by Feature A13: Enhanced Supply Air?

Options:

A.

Air flow rate testing every three months

B.

Combustion gas control every six months

C.

System replacement based on manufacturer's guidelines

D.

Maintenance according to the manufacturer's recommendation

Buy Now
Questions 8

Which of the following layouts would meet the requirements to provide enough exposure to meet the precondition in Light?

Options:

A.

Layout with 20% of the regularly occupied area within a 15 ft. (4.5 m) horizontal distance of envelope glazing in each floor and/or in each individual unit

B.

Layout with 25% of the regularly occupied area within a 30 ft. (9 m) horizontal distance of envelope glazing in each floor and/or in each individual unit

C.

Layout with 40% of the regularly occupied area within a 15 ft. (4.5 m) horizontal distance of envelope glazing in each floor and/or in each individual unit

D.

Layout with 50% of the regularly occupied area within a 30 ft. (9 m) horizontal distance of envelope glazing in each floor and/or in each individual unit

Buy Now
Questions 9

Which of the following hazardous materials have been restricted for use in paints in many countries?

Options:

A.

Volatile organic compounds (VOCs) and lead

B.

Cadmium and polychlorinated biphenyls (PCB)

C.

Orthophthalates and per- and polyfluoroalkyl substances (PFASs)

D.

Halogenated flame retardants (HFRs) and perfluorinated alkyl compounds (PFCs)

Buy Now
Questions 10

A team is developing a health-oriented mission statement. Which of the following should be included to comply with Feature C02: Integrative Process?

Options:

A.

Ensure access to a local food market

B.

Evaluate potential impacts of relevant hazards and identify high-risk hazards

C.

Highlight stories from regular occupants who exemplify the project's health culture

D.

Incorporate relevant project goals or strategies that were established during the stakeholder charrette

Buy Now
Questions 11

An Environment. Health and Safety (EHS) manager finds that an quality at an indoor construction site is degrading because the contractors are demolishing wooden boards Which stop should the manager lake first to address this problem?

Options:

A.

Clean and seal all the ducts

B.

Use walk-off mats at entryways

C.

Use saws with dust guards or collectors

D.

Install media filters with a PM10 removal rating

Buy Now
Questions 12

Which of the following performance testing results is compliant with the requirements of the WELL Building Standard's Water concept?

Options:

A.

Copper is equal to 5 mg/L

B.

Lead is equal to 0 05 mg/L

C.

Chromium is equal to 0.08 mg/L

D.

Cadmium is equal to 0.01 mg/L

Buy Now
Questions 13

Feature C07: Enhanced Health and Wellness Promotion requires projects to cultivate a culture of health through communication, health promotion programs and educational sessions. What is the minimum frequency required of these sessions?

Options:

A.

Weekly

B.

Monthly

C.

Quarterly

D.

Annually

Buy Now
Questions 14

For an office building with 1,500 regular occupants and 500 occasional visitors per day, which of the following facilities meets the requirements established in Feature V04: Facilities for Active Occupants?

Options:

A.

Seven showers with changing facilities and 45 lockers are available in the building

B.

Nine showers with changing facilities and 40 lockers are available in the building

C.

10 showers with changing facilities and 50 lockers are available within 500 ft. (150 m) walking distance of the project boundary

D.

12 showers with changing facilities and 50 lockers are available within 700 ft. (225 m) walking distance of the project boundary

Buy Now
Questions 15

Which strategy should be met to support circadian rhythm in a project with a small amount of glazing?

Options:

A.

Install blinds

B.

Specify CRI ≥ 80 with R9 ≥ 0

C.

Conduct a daylight simulation

D.

Achieve 150 EML [136 M-EDI(D65)]

Buy Now
Questions 16

Which of the following are short-term effects of poor indoor air quality?

Options:

A.

Headaches, dry throat, eye irritation and runny nose

B.

Respiratory infections, coronary heart disease and stroke

C.

Asthma attacks, lung cancer and sudden infant death syndrome

D.

Depression, dementia, metabolic disorders and high blood pressure

Buy Now
Questions 17

Which strategy could a project pursue to meet requirements in a precondition in the Mind concept?

Options:

A.

Provide free clinical screenings

B.

Provide ongoing volunteer opportunities

C.

Provide free mindfulness programming. including in-person yoga or virtual meditation classes

D.

Provide educational material regarding healthy nutrition, including recipes and cooking methods

Buy Now
Questions 18

As a part of a new initiative of a hospital, the program leader is targeting Feature C11: Civic Engagement. Which of the following policies should be implemented to support this endeavor?

Options:

A.

Coordinate a volunteer opportunity once a year

B.

Provide eight hours of paid time for community involvement annually

C.

Contribute annually to a registered charity program to match employee donations

D.

Plan a pre-paid workshop event to educate the community on health and well-being

Buy Now
Questions 19

Please click on the Project Scenario B button to review the project scenario and answer the following question.

BAY TOWERS BY BAYLEAF - SEATTLE, UNITED STATES - PROJECT SCENARIO B. Bay Towers by Bayleaf is a 20-floor commercial building overlooking Elliot Bay in Seattle, United States.

The building enjoys abundant natural light through floor to ceiling windows which take in Elliot Bay city views. Although located behind a major highway (four-lanes of traffic), there is a pedestrian bridge which connects their ground floor reception to the riverfront park on the other side of the highway.

The building is owned and operated by Bayleaf Inc., a real-estate organization. The building is leased at a 70% occupancy rate by a range of tenants, including those in finance, technology and healthcare. The total expected occupancy of the building is 1,000 people.

Bay Towers is mechanically ventilated and currently has MERV 11 filters. As the building owner, Bayleaf provides HVAC fit-out for tenant spaces, but tenants complete the interior walls and supply the finishes and furniture themselves. While no food is provided by Bayleaf, some individual tenants do have pantries where they provide their own snacks and beverages for their own employees.

Bayleaf manages the building and operates the ground floor which includes the reception, building management office, meeting rooms, as well as the elevator banks on each floor and the rooftop. Meeting rooms are common amenities that are able to be booked by the tenants. Bayleaf has two employees that work at desks onsite, a receptionist at the front desk and a property manager in the building management office.

PROJECT SCOPE & GOALS

Bayleaf has enrolled Bay Towers for WELL Core Certification to attract and retain high-quality tenants and address growing tenant demand for well-being facilities.

As part of the WELL Core Certification scope, Bayleaf intends to renovate their ground floor and are open to leveraging some of this space to include health and well-being programming.

The scope of renovation will also include upgrades to the base building, such as staircases, end-of-trip facilities and the air filtration system. The rooftop will also be converted into a public green space for tenants to use for recreation. Tables, chairs and barbeque facilities will be added, as well as several gardens, including edible plots and lawn areas.

Bayleaf is hoping their WELL Core Certification will provide some initial feature compliance for tenants wishing to also pursue WELL Certification for their spaces.

Options:

A.

Zero

B.

One

C.

Two

D.

90

Buy Now
Questions 20

Please click on the Project Scenario A button to review the project scenario and answer the following question.

MILO DESIGN STUDIO - SHENZHEN, CHINA - PROJECT SCENARIO A

MILO is a small, multi-disciplinary design studio with 30 employees located in Shenzhen, China. Their

primary business is interior commercial fit-outs and they also offer sustainability consulting. Three of their employees have achieved their WELL AP credential.

They have recently leased one floor 21,528 ft.a (2 000 m2) in a building owned by another organization to use as their new studio office. This space includes floor to ceiling windows on all four exterior walls. While the windows are numerous, they are also highly tinted, with a visible light transmittance of approximately 0.35 (35%). They intend on installing several living plant walls and have included natural fibers and patterns in their finishings throughout.

Their building is located 984.25 ft. (300 m) from an underground train station and across the road (approx. 328.08 ft. (100 m)) from a large public park. While many employees have indicated that they bike to work on bike trails, the new building's landlord will not allow tenants to use the elevators to bring bicycles to their offices. Instead, their building has bike racks at the building entrance, an underground garage for bike storage, small rentable lockers and basic bike maintenance tools.

MILO considers itself a human-centric design firm and leads with a people-first approach through its

employee benefits and organizational policies. As an example, they offer a 50% discount on several

mindfulness apps and make guided meditation courses available twice per year to all employees on-site.

PROJECT SCOPE & GOALS

MILO has enrolled their office for WELL Certification to demonstrate their commitment to designing for well-being and employee health. They will be renovating and designing the entire fit-out themselves, including new space configurations that will prioritize natural light.

The space layout will include seating for 45 people in an open-plan office with hot-desking, three conference rooms and four individual phone booths. Additionally, they are planning to update lighting fixtures and purchase new office furniture. MILO do not provide any food or beverages on a daily basis except coffee and tea.

MILO is targeting WELL Certification at the Gold level or higher. This effort is being led by one of their inhouse WELL APs.

Given the facade design, referenced in the protect scenario A, which feature is most appropriate for this project?

Options:

A.

Feature L04 Electric Light Glare Control

B.

Feature L05 Daylight Design Strategies

C.

Feature L06 Daylight Simulation

D.

Feature L09 Occupant Lighting Control

Buy Now
Questions 21

Which of the following references could be used for Feature L02: Visual Lighting Design, Part 1: Provide Visual Acuity?

Options:

A.

ISO 8995-1:2002

B.

AS 1668.4-2012

C.

ANSI S3.1-2018

D.

2019 CARB SCM

Buy Now
Questions 22

A small percentage of building occupants report chronic thermal discomfort. What strategy should be used to address this problem?

Options:

A.

Install ceiling fans

B.

Reduce relative humidity

C.

Lock thermostat setpoints

D.

Offer personal heating/cooling devices

Buy Now
Questions 23

A client of a commercial building reports odors and high-humidity levels in a regularly occupied space next to the occupant's kitchen. Which of the following doors should the WELL AP recommend installing between these regularly occupied spaces?

Options:

A.

Double doors

B.

Sliding doors

C.

Solid core doors

D.

Self-closing doors

Buy Now
Questions 24

A consultant on a WELL project is working with the design team to enhance speech privacy in conference rooms.

Which of the following would be most effective at maximizing speech privacy in these spaces?

Options:

A.

Provide acoustic ceilings in all meeting rooms

B.

Locate the meeting rooms adjacent to loud zones

C.

Propose mechanical ventilation instead of natural ventilation

D.

Recommend a sound masking system within the meeting rooms

Buy Now
Questions 25

The annual average particulate matter (PM2.5) outside of an office is 30 ug/m*. Which of the following indoor test results meets the requirements of Feature A01: Air Quality?

A)

WELL-AP Question 25

B)

WELL-AP Question 25

C)

WELL-AP Question 25

D)

WELL-AP Question 25

Options:

A.

Option A

B.

Option B

C.

Option C

D.

Option D

Buy Now
Questions 26

Which thermal comfort parameter can be controlled by the use of automatic window shades?

Options:

A.

Air movement

B.

Relative humidity

C.

indoor air temperature

D.

Mean radiant temperature

Buy Now
Questions 27

To contribute to Feature A11: Source Separation, which of the following rooms is most likely to require exhaust fans such that the return air is vented outdoors and not recirculated?

Options:

A.

Copy rooms

B.

Activity room

C.

Lactation room

D.

Conference rooms

Buy Now
Questions 28

A project team wants to provide compliant cycling infrastructure for its occupants to fulfill a WELL feature. Which of the following should the team implement?

Options:

A.

The project is located near a bike network that connects riders to five use types

B.

Long-term bike parking (e.g., bike room) can accommodate at least 2.5% peak visitors

C.

The project is located in an area (zip or postal code) with a minimum Bike Score® of 40

D.

Short-term bike parking (e.g., outdoor bike racks) is available for at least 2.5% of peak visitors

Buy Now
Questions 29

A WELL AP is creating a pest management plan based upon integrated pest management (IPM) principles. What is the most effective strategy to minimize the use of pesticides?

Options:

A.

Record pest monitoring data and pest events

B.

Create protocols to prevent the attraction of pests

C.

Ensure all active substances are catalogued as low risk

D.

Provide notifications to all building occupants on the protocol (or pest treatments

Buy Now
Questions 30

A WELL AP is reviewing a client's waste management plan for Feature X09: Waste Management. Which key requirement must be confirmed?

Options:

A.

Recycling containers are paired with waste receptacles

B.

Food waste is collected for on-site or off-site composting

C.

Protocols for managing and minimizing hazardous waste are included

D.

Cardboard, glass, paper, plastic and metals are collected for recycling

Buy Now
Questions 31

Please click on the Project Scenario B button to review the project scenario and answer the following question.

BAY TOWERS BY BAYLEAF - SEATTLE, UNITED STATES - PROJECT SCENARIO B. Bay Towers by Bayleaf is a 20-floor commercial building overlooking Elliot Bay in Seattle, United States.

The building enjoys abundant natural light through floor to ceiling windows which take in Elliot Bay city views. Although located behind a major highway (four-lanes of traffic), there is a pedestrian bridge which connects their ground floor reception to the riverfront park on the other side of the highway.

The building is owned and operated by Bayleaf Inc., a real-estate organization. The building is leased at a 70% occupancy rate by a range of tenants, including those in finance, technology and healthcare. The total expected occupancy of the building is 1,000 people.

Bay Towers is mechanically ventilated and currently has MERV 11 filters. As the building owner, Bayleaf provides HVAC fit-out for tenant spaces, but tenants complete the interior walls and supply the finishes and furniture themselves. While no food is provided by Bayleaf, some individual tenants do have pantries where they provide their own snacks and beverages for their own employees.

Bayleaf manages the building and operates the ground floor which includes the reception, building management office, meeting rooms, as well as the elevator banks on each floor and the rooftop. Meeting rooms are common amenities that are able to be booked by the tenants. Bayleaf has two employees that work at desks onsite, a receptionist at the front desk and a property manager in the building management office.

PROJECT SCOPE & GOALS

Bayleaf has enrolled Bay Towers for WELL Core Certification to attract and retain high-quality tenants and address growing tenant demand for well-being facilities.

As part of the WELL Core Certification scope, Bayleaf intends to renovate their ground floor and are open to leveraging some of this space to include health and well-being programming.

The scope of renovation will also include upgrades to the base building, such as staircases, end-of-trip facilities and the air filtration system. The rooftop will also be converted into a public green space for tenants to use for recreation. Tables, chairs and barbeque facilities will be added, as well as several gardens, including edible plots and lawn areas.

Bayleaf is hoping their WELL Core Certification will provide some initial feature compliance for tenants wishing to also pursue WELL Certification for their spaces.

Although the current MERV 11 filters in the return air ducts contribute toward compliance with Feature A04:

Construction Pollution Management, the installation of MERV 14 filters could help to achieve which additional feature?

Options:

A.

Feature A12: Air Filtration

B.

Feature A13: Enhanced Supply Air

C.

Feature A06: Enhanced Ventilation Design

D.

Feature A09: Pollution Infiltration Management

Buy Now
Questions 32

What is the intent of the Feature N02: Nutritional Transparency?

Options:

A.

To avoid refined ingredients

B.

To encourage informed food choices

C.

To promote consumption of whole grains

D.

To limit sugar content in food and beverages

Buy Now
Questions 33

A WELL AP is working on a renovation project in an existing building that is suspected to contain lead paint.

To confirm that the paint contains lead, the WELL AP requests in-situ testing. Which one of the following types of tests is acceptable to confirm the lead hazard?

  • X-ray fluorescence (XRF)

  • Polarized light microscopy (PLM)

  • Transmission electron microscopy (TEM)

Options:

A.

NIOSH Manual of Analytical Methods (MNAM) Method 7400

Buy Now
Questions 34

Workplace family support includes parental leave policies that give paid paternity and maternity leave for the primary caregiver during any 12-month period for at least

Options:

A.

Six work weeks

B.

Eight work weeks

C.

10 work weeks

D.

12 work weeks

Buy Now
Questions 35

A project's interior designer is designing a room that will act as a restorative space for future employees to break from work and relax. The space will be at least 75 ft2 (7 m2) plus 1 ft2 (0.1 m2) per regular occupant. It will also include features like dimmable lighting, sound masking and calming colors. What additional element(s) should the interior designer incorporate to contribute towards meeting the requirements of the respective WELL optimization?

Options:

A.

A mindfulness training course by a qualified instructor

B.

A room-booking system for staff to reserve time to use the room

C.

Activity accessories, such as yoga mats, weights or exercise balls

D.

Signage or education materials explaining the intended use of the space

Buy Now
Questions 36

For a project seeking WELL Certification, from which of the following professionals would a Letter of Assurance be required?

Options:

A.

Owner

B.

WELLAP

C.

Project Manager

D.

Sustainability Consultant

Buy Now
Questions 37

The WELL Building Standard™ (WELL™) requires a project team to limit the use of pesticides to those with which Hazard Tier ranking?

Options:

A.

Tier 1

B.

Tier 2

C.

Tier 3

D.

Tier 4

Buy Now
Questions 38

Please click on the Project Scenario A button to review the project scenario and answer the following question.

MILO DESIGN STUDIO - SHENZHEN, CHINA - PROJECT SCENARIO A

MILO is a small, multi-disciplinary design studio with 30 employees located in Shenzhen, China. Their

primary business is interior commercial fit-outs and they also offer sustainability consulting. Three of their employees have achieved their WELL AP credential.

They have recently leased one floor 21,528 ft.a (2 000 m2) in a building owned by another organization to use as their new studio office. This space includes floor to ceiling windows on all four exterior walls. While the windows are numerous, they are also highly tinted, with a visible light transmittance of approximately 0.35 (35%). They intend on installing several living plant walls and have included natural fibers and patterns in their finishings throughout.

Their building is located 984.25 ft. (300 m) from an underground train station and across the road (approx. 328.08 ft. (100 m)) from a large public park. While many employees have indicated that they bike to work on bike trails, the new building's landlord will not allow tenants to use the elevators to bring bicycles to their offices. Instead, their building has bike racks at the building entrance, an underground garage for bike storage, small rentable lockers and basic bike maintenance tools.

MILO considers itself a human-centric design firm and leads with a people-first approach through its

employee benefits and organizational policies. As an example, they offer a 50% discount on several

mindfulness apps and make guided meditation courses available twice per year to all employees on-site.

PROJECT SCOPE & GOALS

MILO has enrolled their office for WELL Certification to demonstrate their commitment to designing for well-being and employee health. They will be renovating and designing the entire fit-out themselves, including new space configurations that will prioritize natural light.

The space layout will include seating for 45 people in an open-plan office with hot-desking, three conference rooms and four individual phone booths. Additionally, they are planning to update lighting fixtures and purchase new office furniture. MILO do not provide any food or beverages on a daily basis except coffee and tea.

MILO is targeting WELL Certification at the Gold level or higher. This effort is being led by one of their inhouse WELL APs.

Based on the supplied information, the project would contribute to Feature M07 Restorative Spaces if they offered access to which of the following?

Options:

A.

A plant wall

B.

A mother" s room

C.

An exercise room

D.

A designated quiet zone

Buy Now
Questions 39

The WELL AP notices mold and fungal growth on some indoor walls and ceilings of enclosed regularly occupied spaces. Which of the following is the most likely cause of the mold and fungal growth?

Options:

A.

Ducts were not properly sealed and protected during the construction stage

B.

Commissioning Agent did not confirm that the ventilation rate exceeds 21 cfm/person (10 L/s)

C.

Sensors were not installed in occupiable spaces to monitor dry-bulb temperature and relative humidity

D.

Mechanical system does not have the capability of maintaining relative humidity between 30% and 60% at all times

Buy Now
Questions 40

At a local university, lecturers teaching in an auditorium receive feedback that students experience an echo during class.

The following is some basic information about the auditorium:

. There are a total of 200 fully upholstered seats (10 rows of 20 seats each)

. A fabric covered ceiling is installed, suspended 5 ft. (1.52 m) from the concrete slab above

. 50% of the floor is carpeted, with the other 50% bare concrete finish

. The walls are left as bare concrete

Which of the following design interventions would be most likely to reduce reverberation times in the auditorium?

Options:

A.

Remove the first row of seats

B.

Add a sound masking system

C.

Remove carpet to expose the slab floor

D.

Provide a fabric covering over the existing concrete walls

Buy Now
Questions 41

The WELL project administrator realizes that a project's special circumstances do not meet the WELL features, as written. They would like to explore other means of compliance and cannot find a similar situation in the official International WELL Building Institute™ (IWBI™) guidelines. What should the project administrator do next?

Options:

A.

Contact the WELL Reviewer

B.

Submit an Equivalency Proposal

C.

Communicate with the project architect

D.

Submit an alternative adherence path (AAP)

Buy Now
Questions 42

A WELL AP is reviewing a zoning layout for a new WELL commercial fit-out project. Which of the following spaces should be labeled as acoustically quiet zones?

Options:

A.

Classrooms

B.

Lift lobbies

C.

Lactation rooms

D.

Recreational rooms

Buy Now
Questions 43

A shopping center wants to comply with W08: Hygiene Support in family bathrooms. Which of the following is a strategy to achieve this feature?

Options:

A.

Touch-free exit

B.

Cleaning records

C.

Diaper dispenser

D.

Children's toilet facilities

Buy Now
Questions 44

Which of the following environmental cues is most important in regulating the body's Orcadian rhythm?

Options:

A.

Odor

B.

Light

C.

Sound

D.

Humidity

Buy Now
Questions 45

There is an office building with a regularly occupied project area of 25.000 ft2 (2 322 m2). In which the owner wants to implement radiant heating and cooling to achieve a higher level of thermal comfort for the occupants To meet Feature T05 Radiant Thermal Comfort, what is the minimum area that must be serviced by radiant heating or cooling?

A)

WELL-AP Question 45

B)

WELL-AP Question 45

C)

WELL-AP Question 45

D)

WELL-AP Question 45

Options:

A.

Option A

B.

Option B

C.

Option C

D.

Option D

Buy Now
Questions 46

An Environment, Health and Safety (EHS) manager finds that the air quality at an indoor construction site is degrading because the contractors are demolishing wooden boards. Which step should the manager take first to address this problem?

Options:

A.

Clean and seal all the ducts

B.

Use walk-off mats at entryways

C.

Use saws with dust guards or collectors

D.

Install media filters with a PM10 removal rating

Buy Now
Questions 47

A WELL AP is monitoring the ongoing submission of documents required for a WELL Certified project. Which strategy should the WELL AP use to ensure the requirements are met?

Options:

A.

Collect the appropriate documents annually and submit them through email

B.

Collect and submit all required documents at the 18 and 36 month marks of certification

C.

Collect and submit all required documents within 15 months of certification and every 12 months thereafter

D.

Develop a schedule with the project owner to collect the right information on an ongoing basis and submit every three years through the WELL digital platform

Buy Now
Questions 48

Studies indicate that the use of antibiotics in livestock and pesticides in agricultural crops contributes to which of the following conditions in people who consume associated food products?

Options:

A.

Metabolic syndrome

B.

Higher body mass index (BMI)

C.

Adverse reproductive consequences

D.

Increased tendency for substance abuse

Buy Now
Questions 49

A new retail pharmacy is designing a healthy entryway to achieve Pollution Infiltration Management. The entryway, which is 10 ft. (3 m) long and the width of the entrance, consists of a grating system and rollout mats to effectively reduce the transmission of pollutants. The entryway is vacuumed once a week by the facilities team. How should this healthy entryway be changed to meet the requirements of the standards?

Options:

A.

Remove the rollout mats

B.

Remove the grating system

C.

Increase vacuuming to once a day

D.

Increase the length to at least 15 ft. (4.5 m)

Buy Now
Questions 50

Thermal Comfort is known to impact which of the following

Options:

A.

Productivity

B.

Chionic stress

C.

immune system

D.

Cardiovascular system

Buy Now
Questions 51

Along with turbidity, which parameter requires a performance test in bathroom faucets?

Options:

A.

Mercury

B.

Benzene

C.

Coliforms

D.

Trihalomethane

Buy Now
Questions 52

A residential building has a small atrium. Which of the following should the WELL AP recommend to contribute toward Feature M07: Restorative Spaces?

Options:

A.

Table tennis table

B.

Fresh fruit options

C.

Filtered water dispenser

D.

Moveable seating arrangements

Buy Now
Questions 53

Which of the following strategies can be used to improve the visual balance in a workspace?

Options:

A.

Vary the color temperatures of light fixtures within the room

B.

Increase the horizontal and vertical luminance contrast ratios to 15

C.

Replace magnetic ballasts on fluorescent lights with electronic ones

D.

Increase the illuminance uniformity ratio to at least 0.4 on the work surface

Buy Now
Questions 54

The office manager has received several complaints that staff who use the boardroom can clearly hear and understand conversations that take place in the adjacent corridor. What is the likely cause of this acoustic issue?

Options:

A.

Exposed soffits in the corridor

B.

Hollow core door separating me spaces

C.

Timber flooring installed in the boardroom

D.

Water pipes that run through the boardroom and corridor

Buy Now
Questions 55

A WELL AP is developing a project's waste management plan. Which of the following is the best strategy lot managing the cleaning of spills of mercury, pesticides and battery acid?

Options:

A.

Label storage containers property

B.

Contain ail residue in a sealed container

C.

Arrange for annual removal of all containers

D.

Assign inventory storage locations for containers

Buy Now
Questions 56

A developer wants to complete WELL Certification quickly for a WELL Core office building. The WELL documentation is approved for the project, the base building is complete, but the building is not yet occupied. Which step should the project team take first to address the developer's goal?

Options:

A.

Apply for the certificate of occupancy (CO)

B.

Determine the schedule for the tenants finish-out and move-in

C.

Inform the developer that performance verification requires at least 50% occupancy

D.

Schedule performance verification since all pre-verification requirements are

Buy Now
Questions 57

A primary school principal would like to Improve the fitness of primary school students. Which of the following suggestions should the WELL AP recommend to also most a WELL feature?

Options:

A.

Schedule a 40-mmuto physical education class for students each week

B.

Coordinate an annual swimming competition m which all students participate in at least one event

C.

implement a policy to offer sports activities for students at no cost for 75 minutes every school day

D.

Organize a one-month walking competition to inspire students to walk at least 10.000 steps per day

Buy Now
Questions 58

A project owner would like to raise awareness of healthy foods to their occupants. Which of the following strategies will also help fulfil a WELL feature?

Options:

A.

Offer a variety or Mediterranean-style and vegetarian options

B.

Offer organic food and Certified Humane® options at least once a week

C.

Offer sugar-free beverages and low-fat dairy products with discounted prices

D.

Design a digital message board and menu featuring a variety of fruits and vegetables

Buy Now
Questions 59

A project's interior designer is designing a room that will act as a restorative space for future employees to break from work and relax. The space will be at least 75 ft2 (7 m2) plus 1 ft2 (0.1 m2) per regular occupant. It will also include features like dimmable lighting, sound masking and calming colors. What additional element(s) should the interior designer incorporate to contribute towards meeting the requirements of the respective WELL optimization?

Options:

A.

A mindfulness training course by a qualified instructor

B.

A room-booking system for staff to reserve time to use the room

C.

Activity accessories, such as yoga mats, weights or exercise balls

D.

Signage or education materials explaining the intended use of the space

Buy Now
Questions 60

A well-being team in a commercial office building is interested in starting a garden. Twenty of the 400 employees are interested in starting an herb and vegetable garden. A minimum of how much space is required for the garden to earn an Optimization in the WELL Building Standard™ (WELL™)?

Options:

A.

20 ft2 (2 m2)

B.

200 ft2 (18 m2)

C.

400 ft2 (36 m2)

D.

600 ft2 (56 m2)

Buy Now
Questions 61

A project successfully received both LEED® and BREEAM® certification. The project's WELL Certification is managed by two WELL APs. How many additional points would the project need to achieve the full score under Innovation?

Options:

A.

Two points

B.

Three points

C.

Four points

D.

Five points

Buy Now
Exam Code: WELL-AP
Exam Name: WELL Accredited Professional (WELL AP) Exam
Last Update: Nov 16, 2024
Questions: 204

PDF + Testing Engine

$57.75  $164.99

Testing Engine

$43.75  $124.99
buy now WELL-AP testing engine

PDF (Q&A)

$36.75  $104.99
buy now WELL-AP pdf